Policy & Planning agenda June 2018

interventions and any evidence of a change in attainment of the NPS-FM swimmability criteria; the very high rate of attainment of swimmability in Taranaki if assessed against EU criteria instead of NPS-FM criteria; and the absence of any correlation between nutrient trends and macroinvertebrate community health trends 4. notes the report’s findings highlight the potential dangers of a ‘one size fits all’ problem analysis and solution imposition to water quality interventions at a national level

Westown Haulage (additional cleanfill) monitoring 2020-2021

consent holders to resource management and, ultimately, through the refinement of methods and considered responsible resource utilisation, to move closer to achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the Company, this report also assigns them a rating for their environmental and administrative performance during the period

Rimu PS consent monitoring 2020-2021

performance Besides discussing the various details of the performance and extent of compliance by WestSide, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with WestSide’s approach to demonstrating consent compliance in site operations

Application attachment Proposed Conditions x 14 Consents Manawa Energy 14 February 2023

consent holder shall maintain a residual flow of not less than 400 litres / second in the Manganui River immediately downstream of the diversion weir. The residual flow shall be provided via the two fish passes located either side of the diversion weir. 3. The consent holder shall install and operate a monitoring device capable of measuring, at a minimum of 15 minute intervals and with +/- 5% measurement accuracy, the diversion and taking rate of water from the Manganui River

Annual report 2012-2013

low flow conditions during the monitoring period (at which time the Manaia system had been upgraded with the addition of two wetlands, the Kaponga pond subsurface discharge rate was very low and receiving water dilution very high, and the Patea upgraded ponds system discharged continuously), or on other occasions when monitoring of impacts was required by specific consent conditions. This monitoring continued the increased frequency of bacteriological receiving water surveys in the lower

Report 2013-2014

unless the activity is expressly allowed for by resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. The Council determined that the application to take groundwater fell within Rule 49 of the Regional Freshwater Plan for Taranaki (RFWP) as the rate and daily volume of the groundwater abstraction might exceeded that of the permitted activity (Rule 48). Rule 49 provides for groundwater abstraction as a controlled activity, subject

Annual report 2015-2016

and a administrative performance for their two facilities located on the Waitara and Pennington Roads, while environmentally, improvement is required at RNZ’s Mokau Road facility at Uruti, though there administration was rated as good. For reference, in the 2015-2016 year, 71% of consent holders in Taranaki monitored through tailored compliance monitoring programmes achieved a high level of environmental performance and compliance with their consents, while another 24% demonstrated a good

Schedules of charges 2019/2020

page 63 Appendices Appendix 1: Charging Policies Resource Management Act Charging Policy Schedule of charges pursuant to section 36 of the Resource Management Act 1991 Schedule 1: Scale of charges for staff time Rate for processing resource consents and responding to pollution incidents. Rate for all other Council work. Professional staff $94/hr $89/hr Professional/supervisory staff $118/hr $110/hr Managers $171/hr $160/hr Support staff $94/hr

Schedules of charges

page 168 Appendix 6: Charging Policies Resource Management Act Charging Policy Schedule of charges pursuant to section 36 of the Resource Management Act 1991 Schedule 1: Scale of charges for staff time Rate for processing resource consents and responding to pollution incidents. Rate for all other Council work. Professional staff $92/hr $87/hr Professional/supervisory staff $116/hr $108/hr Managers $168/hr $157/hr Support staff $92/hr $87/hr Directors

Annual report 2016-2017

refinement of methods and considered responsible resource utilisation, to move closer to achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the consent holder during the period under review, this report also assigns a rating as to the Company’s environmental and administrative performance. Environmental performance is concerned with