Your search for 'rain fall' returned 2010 results.

2019 rainfall maps

… page STRATFORD WAITARA Provisional data only PATEA NEW PLYMOUTH OPUNAKE ELTHAM MANAIA HAWERA EGMONT NATIONAL PARK Total rainfall to date (mm) KEY xxx yy% INGLEWOOD Pohokura Saddle Dawson Falls Cape Egmont Stratford Whareroa Patea North Egmont Inglewood Motunui Brooklands Kaka Rd Kotare Rimunui Glenn Rd Huinga 99% 89% 93% 94% 73% 101%104% 124% 117% 96% 100% 90% 1460 2122 1968

Malandra Downs Annual Report 2020-2021

creation of stable interlocked layers of green waste ensures that it does not fall off, or get blown off the cliffs and down onto the coastal marine area or into the sea. From observations made during the inspection of the site no adverse environmental effects were found, or were expected to have been occurring, as a result of the activity authorised by consent 7374-1.4. 3.3 Evaluation of performance A tabular summary of the consent holder’s compliance record for the year under review is

January rainfall maps

page STRATFORD WAITARA Provisional data only PATEA NEW PLYMOUTH OPUNAKE ELTHAM MANAIA HAWERA EGMONT NATIONAL PARK Total monthly rainfall (mm) KEY xxx yy% INGLEWOOD Pohokura Saddle Dawson Falls Cape Egmont Stratford Whareroa Patea North Egmont Inglewood Motunui Brooklands Kaka Rd Kotare Rimunui Glenn Rd Huinga 47% 36% 37% 23% 15% 18%11% 28% 15% 21% 22% 30% 33 68 52

Supplementary Officer Report for Resource Consent

noted that seven intakes were now in place along the roofline of shed 3, that these included fittings for shed air recirculation as at Midhirst, and that the boilers had been installed and hot water radiators were being piped up inside each shed. 27. Osflo arrived about 10.45 am, and were to begin by emptying shed 4. With rain setting in, I considered there would be little gain in continuing to monitor odour, and left the site about 11 am. 28. My observations on this occasion:-

C D Boyd Drilling Waste and Stockpiling Landfarm and Landspreading Annual Report 2020-2021

enter the stormwater pits. It was recommended to pump this ponded area down, as more rain was forecast. The WTP sludge ponds on the stockpiling site had been completely flattened. Some sedimentation was noted in the nearby drain, however, downstream was clear. The area of ponded drilling waste around the irrigators was no longer present. Pasture strike is good in the recently landfarmed area. No issues were noted. 2.1.2 Results of abstraction and discharge monitoring 2.1.2.1

Lake Rotorangi monitoring report 2019-2020

occasions during 2019-2020 Date Lake level (m asl) Weather Wind Lake appearance L2 L3 L2 L3 17 October 2019 75.7 Broken cloud, fine Light NW Moderate NW Turbid, brown; surface rippled Slightly turbid, dark green; surface rippled 19 February 2020 77.3 Overcast, drizzle; heavy rain preceding Calm Calm Clear, dark green; surface flat Clear, dark green; surface rippled 19 March 2020 76.8 Overcast, light rain Light NW breeze Calm …