Your search for 'rain fall' returned 1967 results.

Osflo Fertiliser Ltd Annual Report 2023 2024

inspection it was noted that the pedestrian entrances to the shed now had a protected doorway porch to prevent wind and rain from entering the shed. During each inspection a sample of the stream was obtained. The samples were clean and clear with no sheen or odour, iron oxide is naturally present in the stream. There was no discharge from the stormwater system to sample during any of the inspections. At the time of each inspection the Company were operating in compliance with their resource

Operations and Regulatory Committee Agenda November 2022

Rules 35 and 36 of the RFWP do not include any matters of control that expressly allow for the consideration of matters such as those expressed in the NPS-FM objective. Given that the Council can only consider policies that relate to the matters over which the Council has reserved control through the plan itself, the Council is unable to take into account matters that fall outside this scope. In terms of the notification assessment and when deciding whether a person is an affected person, the

SH3 Working Group brochure October 2024

were markedly improved on the approach to the Piopio South Passing Lane, and hazardous poplar trees were removed on outside of same curve. Example - Awakino Gorge Guardrail (2006) The guardrail was installed at the location of a number of crashes, and protects the corner for a distance of approximately 400m. There was also some replacement of square kerbing with radial. Mangaotaki Rockfall (2008) Heavy rain triggered a large rock fall on

Taranaki By Products Air and Water Annual Report 2022-2023

page 14 trap, near the Firewater Pond. The carpark area project was on-going and a digger was working by burial pit. The entrance to the old dairy factory on Old Normanby Road had traces of left over burial pit product in front of the entrance. TBP staff were advised that this needed attention, as it was forming a crust and heavy rain would likely cause it to discharge to the drain. A discussion was had about the importance of having underground drain plans and these were again

Policy and Planning Committee agenda 29 April 2025

lakes in the region are small lakes classified as having an open water area of between one and five hectares. Only two lakes are recorded as having an open water area of greater than 30 hectares. 13. In addition, there are a number of lakes in the region with an open water area of less than one hectare which are not identified by FENZ, but still fall within the broad definition of ‘lake’ under the RMA.5 These water bodies are more likely to be classified as wetlands rather than

Concrete plants consent monitoring 2020-2021

page 9 3.2 Results 3.2.1 Inspections 08 December 2020 An inspection was undertaken to assess compliance with the wastewater discharge consent. A prolonged period of rain occurred prior to the inspection. The yard was relatively clean and tidy. No evidence of spills. The discharge of stormwater onsite into the roadside drain looked much improved from the last inspection. A sample of the settling pond discharge into the wetland was unable to be collected due to a new

Greymouth Turangi-C monitoring report 2016-2018

June 2027 9422-1 To discharge stormwater and sediment, deriving from soil disturbance undertaken for the purpose of constructing the Turangi-C wellsite. 5 February 2013 N/A 1 June 2017 1.3.1 Water abstraction permit Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. The

Report 2012-2013

regional plan, or it falls within some particular categories set out in Section 14. The Council determined that the application to take groundwater fell within Rule 49 of the Regional Freshwater Plan for Taranaki (RFWP) as the rate and daily volume of the groundwater abstraction might exceed that of the permitted activity (Rule 48). Rule 49 provides for groundwater abstraction as a controlled activity, subject to two conditions: • The abstraction shall cause not more than a 10% lowering