was in place and plants purchased form Council were on site
for this purpose. The monitoring of this last section of reinstatement was undertaken
by Council land management department which reports that the works had been
completed and that further plantings had been undertaken at various places around
the site. A copy of the riparian plan map is attached as Appendix II.
Overall the site was managed well and the extensive quarry reinstatement plantings
have continued.
2.2
Table 27 Summary of compliance with consent 3900-2 over the 2018-2020 monitoring period 64
Table 28 Summary consent conditions for consent 10583-1 over the 2018-2020 monitoring period 69
Table 29 Summary of compliance with consent 1509-4 over the 2018-2020 monitoring period 70
List of figures
Figure 1 Map showing monitored quarrying locations in Taranaki 5
Figure 2 AA Contracting Ltd quarry site 12
Figure 3 Map of Jones Quarry Ltd Kekeua Road quarry, showing Mangaone …
e.g. SH3. The expansion of Bell Block towards the
poultry farm is well illustrated in the PDP maps below in Figure 1.
Figure 1: Application Site shown in black and white hatching. Yellow is
residential zone (purple outlined yellow area is Area Q). Grey is Special Purpose
– Future Urban Zone (Area R).
1 Paragraph 5.3, Odour Assessment
page
6
Changes since consent was granted in 2011
23. Since the current consents
of water irrigation allocation per activity in the Taranaki region 4
Figure 2 Source of water for irrigation in Taranaki during the 2019-2020 period 4
Figure 3 Total consented water abstractions – distributed by activity 2019-2020 4
Figure 4 Pasture irrigation zones and locations of consented irrigation in Taranaki 5
Figure 5 Distribution map of the total rainfall recorded from 1 October 2019 to 31 March 2020 10
List of photos
Photo 1 Picture depicting k-line long …
fracturing fluid sampling 12
Table 7 Results of hydraulic fracturing return fluid sampling 13
Table 8 Summary of performance for consent 10000-1 17
List of figures
Figure 1 Location map 5
Figure 2 Location of biomonitoring sites in relation to the Turangi-A wellsite 15
page
1
1 Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 Introduction
This report outlines and discusses the results of
time-proportioned composite
samples 22
Figure 8 Map of sampling sites in relation to the outfall 25
Figure 9 Mean number of species per quadrat for summer surveys (1986-2022) 26
Figure 10 Mean Shannon-Weiner Indices per quadrat for summer surveys (1986-2022) 26
Figure 11 Location of air deposition sites 28
Figure 12 Milk powder fallout at air deposition sites surrounding Whareroa (September to December
2021) 29
Figure 13 PM10 concentrations (µg/m³) at the Whareroa dairy complex 30
be determined. Contaminated material from the
excavation was being removed to a licenced land farm on Manawapou Road for remediation. There was no
evidence of any ground water contamination. Iwi also inspected the site. A letter of explanation in relation
to the incident was received and accepted and no further action was required.
A re-inspection of the area in the vicinity of the pipeline leak adjacent to the Kauri-E well site was carried out
on 27 March 2018. Repairs and surveys had
policies of particular relevance
Policy number Commentary
3.2
The adverse effects of the discharge of contaminants to air on wāhi tapu and other
places, areas or features of significance to iwi o Taranaki should be avoided,
remedied or mitigated to the fullest extent practicable.
Consultation
The applicant has undertaken consultation with adjacent landowners and occupiers and as a result changes
are being proposed to the site to address their key concerns.
Any written
policies of particular relevance
Policy number Commentary
3.2
The adverse effects of the discharge of contaminants to air on wāhi tapu and other
places, areas or features of significance to iwi o Taranaki should be avoided,
remedied or mitigated to the fullest extent practicable.
Consultation
The applicant has undertaken consultation with adjacent landowners and occupiers and as a result changes
are being proposed to the site to address their key concerns.
Any written
environment.
Around the Taranaki coastline, particular reefs are regarded as property of particular hapu. Iwi and hapu
associations with the six SEM reef sites are outlined in Table 1.
page
2
2 Monitoring methodology
2.1 Site location
The location of the six SEM rocky shore sites are shown in Table 1 and Figure 1.
Table 1 Location of SEM rocky shore sites and iwi/hapu associations
Site code Site location
Location
NZTM E/N
Iwi/hapu
SEA900095 Turangi