effluent and stormwater into the Waingongoro River, two
consents to discharge effluent and solids to land, two consents for structures in watercourses, and one
consent to discharge emissions into the air at the plant site.
Monitoring is carried out by both the Company and the Council. The Company monitors water abstraction
rate, effluent flow rate and composition, receiving water quality, odour at the plant boundaries, effluent
loadings and soil and herbage for irrigation areas. The Council
previously exhaust has also been via end wall fans, which are no longer
used for exhaust). The ventilation configuration is to be changed to a
system manufactured by DACS with exhaust via chimney roof vents to aid
dispersion of emissions.
19 Odour will be emitted from the free-range operation at a lower rate than
from conventional broiler (i.e. non free range) operations of an equivalent
scale for the following reasons:
1
located on
Coronation Avenue, New Plymouth. The site is located within the Te Henui catchment, and
forms part of the eastern boundary of Pukekura Park.
TTR was granted resource consent 7470-1 in August 2009 by the Taranki Regional Council (the
Council). The consent authorised the abstraction of up to 170 cubic metres per day (m3/day) of
groundwater from an on-site production bore, at a rate not exceeding 10 litres per second. This
consent was amended to 7470-1.1 on 10 June 2014, where the
except for direct
heating, whether on industrial or
trade premises or on production
land
1
Small-scale
combustion of
natural gas or
liquefied
petroleum gas
a) The maximum rate of heat release from within
the combustion process does not exceed 1
MW per combustion chamber
b) Discharge is free of visible smoke
Permitted
Discharges of contaminants to air
from equipment burning natural gas
or liquefied petroleum gas as a fuel
for any purpose, excluding direct
Raceway, located on Coronation
Avenue, New Plymouth. The site is located within the Te Henui catchment, and forms part of
the eastern boundary of Pukekura Park.
The Taranaki Racing Club was granted resource consent 7470-1 in August 2009. The consent
authorises the abstraction of up to 170 cubic metres per day of groundwater from an on-site
production bore, at a rate not exceeding 10 litres per second. Groundwater abstracted under
consent 7470-1 is primarily used for irrigation purposes. The
_________________________________________________________________________________
_________________________________________________________________________________
3.3 Map Co-ordinates at point of take (either Longitude/Latitude or NZTM):
________________________ Longitude ________________________ Latitude OR
________________________ E ________________________ N (NZTM)
3.4 Legal description of property at site of activity (refer to land title or rates notice)
Policy and Planning Committee Agenda Nov 2023 web
Recreational and fishery values: Moderate access for native fish. Presence of threatened
species. Important habitat for threatened native species. Very popular and highly valued
angling river. Very highly rated for recreational uses and values (some swimming).
Aesthetic and scenic values: Very highly rated for aesthetic and scenic values.
Comments: Median flow of 840L/s at SH3. Considerable water movement downstream from
Everett Park with some Grade 2 and 3 rapids. Water quantity and flows
to demonstrating consent compliance in site operations and management including the timely
provision of information to Council (such as contingency plans and water take data) in accordance with
consent conditions.
Events that were beyond the control of the consent holder and unforeseeable (that is a defence under the
provisions of the RMA can be established) may be excluded with regard to the performance rating applied.
For example loss of data due to a flood destroying deployed field …
volumes 28
C3.6 Test flow rates 28
C3.7 Verification methods for open channels 28
C3.8 Verification methods for partially full pipes 29
C3.9 Determination of measurement
accuracy compliance 29
C3.10 Site verification 29
C3.11 Verification report 29
C3.12 Non-compliance 30
C4 Open channel water measurement technique 30
C4.1 Measurement techniques 30
C4.2 Stage-discharge method 32
C4.3 Recommended decision process 32
C4.4 Recommended service interval for
open