Your search for 'rates' returned 2361 results.

ANZCO Eltham Ltd Monitoring Programme Annual Report 2020-2021

effluent and stormwater into the Waingongoro River, two consents to discharge effluent and solids to land, two consents for structures in watercourses, and one consent to discharge emissions into the air at the plant site. Monitoring is carried out by both the Company and the Council. The Company monitors water abstraction rate, effluent flow rate and composition, receiving water quality, odour at the plant boundaries, effluent loadings and soil and herbage for irrigation areas. The Council

Jason Savelio Karena Pene's evidence

previously exhaust has also been via end wall fans, which are no longer used for exhaust). The ventilation configuration is to be changed to a system manufactured by DACS with exhaust via chimney roof vents to aid dispersion of emissions. 19 Odour will be emitted from the free-range operation at a lower rate than from conventional broiler (i.e. non free range) operations of an equivalent scale for the following reasons: 1

Report 2013-2014

located on Coronation Avenue, New Plymouth. The site is located within the Te Henui catchment, and forms part of the eastern boundary of Pukekura Park. TTR was granted resource consent 7470-1 in August 2009 by the Taranki Regional Council (the Council). The consent authorised the abstraction of up to 170 cubic metres per day (m3/day) of groundwater from an on-site production bore, at a rate not exceeding 10 litres per second. This consent was amended to 7470-1.1 on 10 June 2014, where the

Rules 1-29: Industrial-trade discharges (excluding waste management)

except for direct heating, whether on industrial or trade premises or on production land 1 Small-scale combustion of natural gas or liquefied petroleum gas a) The maximum rate of heat release from within the combustion process does not exceed 1 MW per combustion chamber b) Discharge is free of visible smoke Permitted Discharges of contaminants to air from equipment burning natural gas or liquefied petroleum gas as a fuel for any purpose, excluding direct

Report 2009-2013

Raceway, located on Coronation Avenue, New Plymouth. The site is located within the Te Henui catchment, and forms part of the eastern boundary of Pukekura Park. The Taranaki Racing Club was granted resource consent 7470-1 in August 2009. The consent authorises the abstraction of up to 170 cubic metres per day of groundwater from an on-site production bore, at a rate not exceeding 10 litres per second. Groundwater abstracted under consent 7470-1 is primarily used for irrigation purposes. The

Form 310: Take and use groundwater (including Coastal Marine Area)

_________________________________________________________________________________ _________________________________________________________________________________ 3.3 Map Co-ordinates at point of take (either Longitude/Latitude or NZTM): ________________________ Longitude ________________________ Latitude OR ________________________ E ________________________ N (NZTM) 3.4 Legal description of property at site of activity (refer to land title or rates notice)

Application attachment appendix I Recreation Assessment Manawa Energy 14 Feb 2023 REVISED

Recreational and fishery values: Moderate access for native fish. Presence of threatened species. Important habitat for threatened native species. Very popular and highly valued angling river. Very highly rated for recreational uses and values (some swimming). Aesthetic and scenic values: Very highly rated for aesthetic and scenic values. Comments: Median flow of 840L/s at SH3. Considerable water movement downstream from Everett Park with some Grade 2 and 3 rapids. Water quantity and flows

Lower Waiwhakaiho air discharges monitoring 2019-2020

to demonstrating consent compliance in site operations and management including the timely provision of information to Council (such as contingency plans and water take data) in accordance with consent conditions. Events that were beyond the control of the consent holder and unforeseeable (that is a defence under the provisions of the RMA can be established) may be excluded with regard to the performance rating applied. For example loss of data due to a flood destroying deployed field …

Water measurement code of practice

volumes 28 C3.6 Test flow rates 28 C3.7 Verification methods for open channels 28 C3.8 Verification methods for partially full pipes 29 C3.9 Determination of measurement accuracy compliance 29 C3.10 Site verification 29 C3.11 Verification report 29 C3.12 Non-compliance 30 C4 Open channel water measurement technique 30 C4.1 Measurement techniques 30 C4.2 Stage-discharge method 32 C4.3 Recommended decision process 32 C4.4 Recommended service interval for open