and outflow structures. The plant is bordered by the Patea River to the north, Victoria Road to
the south, Council owned reserve to the east, and privately owned land to the west.
Stratford Wastewater Treatment Plant operates under a consent (#0196-4) authorising
discharge of treated effluent to the Patea River, which expires on the 1st June 2016. An
application for the renewal of the consent was submitted to Taranaki Regional Council (TRC)
in November 2015. A letter from TRC dated 18
The winter was the wettest on record at a number of sites, including Kahui Hut in Egmont
National Park (2132.5mm, or 131% of normal; records since 2005), Mangorei Road at the
reservoir (728mm, 143%, 1989), Waiwhakaiho River at Egmont Village (941mm, 142%,
1990) and Manganui River at Everett Park (844mm, 150%, 1987).
See monthly rainfall maps at www.trc.govt.nz/month-by-month-rainfall/
STRATFORD
WAITARA
Provisional data only
PATEA
NEW PLYMOUTH
OPUNAKE
ELTHAM
methods, contact the Council’s laboratory.
page
13
Bibliography and references
New Plymouth District Court 2011: Notes of Judge B P Dwyer on sentencing; TRC V
COWLEY AND BLACKSTOCK DC NWP CRI-2011-043-002428 [15 December 2011]
Taranaki Regional Council, 2004: Winstone Aggregates Ltd (Manutahi Road quarry), Bell
Block Holdings Ltd and A J Cowley Ltd Combined Monitoring Programme Annual
Report 2003-2004, Technical Report 2004-82.
Taranaki Regional Council,
farming are concentrated in the hill country and also play an important part in the regional
economy.
Exotic forest plantations continue to expand, with the region offering a suitable climate, good forestry sites and a
well-established roading system and port facility.
The oil and gas industry is a major contributor to the regional economy. The Taranaki Basin is currently New
Zealand’s only hydrocarbon producing area, with the Kapuni and the offshore Maui fields making up the major
part …
wastewater treatment plant (WWTP) located on
South Road at Opunake, in the Otahi and Heimama catchments. This is a three-stage treatment system
comprised of a primary oxidation pond, a wetlands treatment system, and a subsurface, reticulated soakage
trench system that subsequently discharges to an unnamed stream between the Otahi Stream and the
Heimama Stream. This report for the period July 2019 to June 2020 describes the monitoring programme
implemented by the Taranaki Regional Council (the …
Waste Remediation Services Symes Landfarm consent monitoring report 2019-2020
Planning 23 July 2024
Resolved
That the Taranaki Regional Council:
a) took as read and confirmed the minutes of the Policy and Planning Committee of the Taranaki
Regional Council held at 10.30 on 23 July 2024 at Taranaki Regional Council 47 Cloten Road
Stratford
b) noted the recommendations therein were adopted by the Taranaki Regional Council on Tuesday
6 August 2024.
Hughes/Cram
Freshwater Implementation Update August 2024
L Hawkins provided a freshwater
Policy & Planning Committee agenda October 2020
the Kaimiro Production Station situated on Upland Road at Inglewood, in
the Waiongana catchment. GPL also operates the Ngatoro-A and Ngatoro-B producing wellsites. The
Ngatoro-A wellsite is located on Upper Dudley Road and the Ngatoro-B wellsite is located on Bedford Road.
Both of these sites are at Inglewood, in the Waitara catchment. A further 23 wellsites are monitored annually
in conjunction with the Kaimiro Production Station.
The report includes the results and findings of the
2016-2017and adopts the specific recommendations therein.
4. receives the 17-21 Cheal DWI Monitoring Programme Annual Report 2016-2017
and adopts the specific recommendations therein.
5. receives the 17-23 Todd Energy Limited DWI Monitoring Programme Annual
Report 2016-2017 and adopts the specific recommendations therein.
6. receives the 17-30 NPDC Colson Road Landfill Monitoring Programme Annual
Report 2016-2017 and adopts the specific recommendations therein.
Ordinary Meeting -