Your search for '72&76 CUTFIELD ROAD WESTOWN' returned 2483 results.

Report 2011-2013 (groundwater monitoring)

wellsite is located off Tikorangi Road East, Tikorangi. The site was established by Todd Taranaki Limited (the Company) in 2006. The resource consents currently held by the Company permit the drilling of up to eight wells from the wellsite. As of 30 June 2013, 4 wells have been drilled from the Mangahewa-C wellsite since its establishment. As part of the on-going well development programme at the wellsite, the Mangahewa-11 and Mangahewa-09 wells were hydraulically fractured following their

MR2013 TaranakiVenturesCopperMoki1Wellsite

February 2011-May 2012 by the Taranaki Regional Council on the monitoring programme associated with resource consents held by Taranaki Ventures Limited in relation to exploration activities at the Copper Moki site. Taranaki Ventures Limited operates a wellsite situated on Cheal Road at Ngaere, in the Patea River catchment. Resource consents were transferred from Green Gate Limited to Taranaki Ventures Limited on 1 April 2011. This report covers the results and findings of the monitoring

Jason Savelio Karena Pene's evidence

boundary to 66 Airport Drive. In very light southerly to southeasterly wind conditions after dawn at this location odour of very weak intensity was intermittently detected at this location. (e) In very light southerly to southeasterly wind conditions after dawn no odour was detected along the eastern road berm of Airport Drive from the entrance to 82 Airport Drive to opposite the entrance to 65 Airport Drive. 60 Observations were also undertaken by my colleague, Michele

Appendices

in the middle of the main river channel. 1. Mohakatino River • River mouth grid reference R18: 508-729 on Infomap 260, Ohura. • Coastal marine area boundary 10 metres downstream of the culvert at the confluence of the Mohakatino River and an unnamed tributary at or about grid reference R18: 508-727. 2. Tongaporutu River • River mouth grid reference Q18: 489-639 on Infomap 260, Tongaporutu, being the upriver side of the southern landfall of the State Highway 3 road bridge. •

Todd Petroleum Mining Company Kapuni Production Station Annual Report 2021-2022

(Pdf) March 2023 page page Executive summary Todd Petroleum Mining Company Ltd (Todd Petroleum) operates the Kapuni Production Station located on Palmer Road in the Kapuni catchment. This report for the period July 2021 to June 2022 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess Todd Petroleum’s environmental and consent compliance performance during the period under review. The report also

Policy and Planning Agenda June 2023

the Taranaki Regional Council held at 10.30 on 7 February 2023 at Taranaki Regional Council 47 Cloten Road Stratford b) noted the recommendations therein were adopted by the Taranaki Regional Council on Tuesday 28 February 2023. Walker/Littlewood 2. Freshwater Programme Review 2.1 Mr A D McLay, Director – Resource Management, Spoke to the memorandum to provide the Committee with an overview of the Essential Freshwater Programme. 2.2 The Committee members were advised

Maui production station consent monitoring 2018-2019

separation, and then to the production station. The Maui Production Station separates the various hydrocarbon components, mainly by distillation. The production station supplies natural gas to the national grid and liquefied petroleum gas (LPG) is transported off-site by road tankers. Condensate is piped to storage tanks at Omata. Facilities at the Maui Production Station include: an administration building and workshop which accommodates the control room on the upper floor; glycol trains and

Annual report 2015-2016

(the Company) operates a petrochemical production station and adjacent power plant located on Otaraoa Road near Tikorangi, bridging the Waitara and Onaero catchments. The McKee Production Station processes oil and gas from the Company’s McKee and Mangahewa groups of wellsites and includes electricity generation and LPG production facilities. Located to the south of the production station, the McKee Power Plant was completed and commissioned during the 2012-2014 period. This 100 MW electricity