Your search for '53 cumming street' returned 1580 results.

Subs 311 410 web

banking arrangements to rebuild our community spirit with a stadium that is more fit for purpose and with expanded operational appeal. Sincerely Philip Brown 11 McLean Street Strandon 4312 NEW PLYMOUTH Ordinary Meeting to hear submissions on the 2019/2020 Plan - List of Submissions received (526) and scanned copies 835 page Ordinary Meeting to hear submissions on the 2019/2020 Plan - List of Submissions received (526) and scanned copies 836

Appendix 1: Site pull report

634644 14-Mar-2008 04-Apr-2008 W01658101 W01658101 Ross, Duncan SPv2 R J Hill Laboratories Limited 1 Clyde Street Private Bag 3205 Hamilton 3240, New Zealand +64 7 858 2000 +64 7 858 2001 mail@hill-labs.co.nz www.hill-labs.co.nz Tel Fax Email Web Extra analyses have been carried out at the request of the client.Amended Report This report replaces an earlier report issued on the 19 Mar 2008 6:03 pm Sample Type: Soil Sample Name: Lab Number: TP1/1 TP1/2 TP1/4 TP1/5 634644.1

Solid Waste Management Committee Agenda 12 August 2021

Review 50 page Taranaki Solid Waste Management Committee - South Taranaki District Council Mid-term WMMP Review 51 page 9 10 9 10 Taranaki Solid Waste Management Committee - South Taranaki District Council Mid-term WMMP Review 52 page Taranaki Solid Waste Management Committee - South Taranaki District Council Mid-term WMMP Review 53 page Taranaki Solid Waste Management Committee - South Taranaki District Council

Contact Energy Stratford Power Station Annual Report 2021-2022

performance for consent 4460-1 50 Table 31 Summary of performance for consent 4461-1 51 Table 32 Summary of performance for consent 4462-1 52 Table 33 Summary of performance for consent 4804-1 52 Table 34 Summary of performance for consent 5633-1 53 page iv Table 35 Summary of performance for consent 5848-1 54 Table 36 Summary of performance for consent 7247-1 55 Table 37 Summary of performance for consent 7248-1 56 Table 38 Summary of performance for

Annual report 2013-2014

with no unauthorised overflows to the stream of any nature. Two incidents of stormwater/sewage overflows were reported in the Konini Street area of the township due to surcharging of the reticulation under very heavy rainfall conditions. Reactivation of an alarmed and telemetered overflow site has been necessary to alleviate sewage entry to domestic property. Signage requirements have been recognised and provided for should such events re-occur. Pond microfloral monitoring which had

Cheal deep well injection monitoring 2019-2020

53 2014-2015 14,705 117 13.4 140 69 2013-2014 12,880 142 12.0 209 58 Deep well injection at Cheal-A wellsite via the Cheal-A7 injection well 2019-2020 22,666 97 20.5 95 71 2018-2019 10,950 134 4.1 101 49 Note * consent limits removed in July 2018 Figure 4 Cheal-A4 well: Daily injection volumes and injection pressures (2019-2020) 0 20 40 60 80 100 120 0 20 40 60 80 100 120 ba r m ³ Daily volume (m³) Maximum …