Your search for 'rainfall monitoring' returned 2597 results.

Regional Transport agenda September 2021

around communication and timing. Changes are already well underway within TRC to improve staff resourcing in this area. Aim to move to treating the RLTP as a living document, that better meets our needs, rather than an 18-month stressful development to meet changing NLTF funding. RLTP Monitoring Framework:  There were discussions on developing the Monitoring Framework for the RLTP.  DCs to send a copy of their last three internal transport reports (reports to their own

TRC Bulletin - February 2019

occurring, the Policy and Planning Committee was told. The region’s District Councils have already made, and are continuing to make, considerable investments in the area, and the TRC is doing its job as a regulator by monitoring and publicly reporting on their environmental performance, and taking enforcement action when necessary. A recent Cabinet paper argued that Government action is needed because wastewater management suffers from the absence of clear national guidelines, unacceptable environmental

Annual report 2016-2017

page Concrete Batching Plants Monitoring Programme Annual Report 2016-2017 Technical Report 2017–29 Taranaki Regional Council ISSN: 1178-1467 (Online) Private Bag 713 Document: 1867045 (Word) STRATFORD Document: 1948145 (Pdf) January 2018 page page Executive summary This report for the period July 2016 to

Annual report 2015-2016

page NZ Pure Bred Genetics Ltd (Piggery) Monitoring Programme Annual Report 2015-2016 Technical Report 2016-93 Taranaki Regional Council ISSN: 1178-1467 (Online) Private Bag 713 Document: 1725496 (Word) STRATFORD Document: 1753499 (Pdf) November 2016 page page Executive summary NZ Pure Bred Genetics Ltd (formerly Meadowvale Piggery) operates a piggery

Annual report 2014-2015

wastewater discharge. Piggery discharge records were checked, and six separate discharges to the Rumkeg Creek had been recorded to date. Because of several unsubstantiated odour complaints received by the Council, the consent holder had installed a weather monitoring station at the piggery. Noted were wind direction (south east), wind speed14.5 km/hour and rainfall volume (77 mm in last 24hrs). page The consent holder has also installed a new solids separator

Annual report 2012-2013

page NZ Pure Bred Genetics Ltd (Piggery) Monitoring Programme Annual Report 2012-2013 Technical Report 2013–04 ISSN: 0114-8184 (Print) Taranaki Regional Council ISSN:1178-1467 (Online) Private Bag 713 Document: 1161518 (Word) STRATFORD Document: 1245758 (Pdf) November 2013 page page Executive summary NZ Pure Bred Genetics Ltd (formerly

Executive, Audit & Risk agenda May 2021

Risk Committee - Financial and Operational Report 11 page  Resource management planning - $145,433 under budget due to staff vacancies and expenditure forecasted to occur later in the year.  Compliance monitoring programmes - $224,283 over budget due to staff focus on monitoring and reporting along with higher overheads.  State of the environment monitoring - $325,772 over budget due to increased staff focus, overheads and increased costs associated with NPS Freshwater.

Hydraulic fracturing

wellsites and a production station, located on Mountain Rd and Taylor Rd at Ngaere, in the Patea and Waingongoro catchments. This 2013 report covers the results and findings of a one-off investigation implemented by the Council relating to past discharges to land and water (including by previous site occupants), following concerns over possible effects of past hydraulic fracturing activities. TAG Oil (NZ) Ltd groundwater monitoring report 2013 (1.1 MB pdf) (single document only) TAG Oil (NZ) Ltd

MR2018 OsfloFertiliser

samples are collected during routine compliance monitoring inspections. During this monitoring period, three of the four surface water monitoring rounds were collected (Table 4). On one round, 18 September 2017, significant heavy rainfall meant the receiving waters of the Awai Stream were in high flow, thus sample analysis would have not produced meaningful results. The analysis of the surface water samples undertaken across the three rounds is provided in Table 4. Specifically in

Oil & gas - hydraulic fracturing

Tokorangi Petrochem Kowhai-D hydraulic fracturing 2017-2018 (1.8 MB pdf) (single document only) Petrochem Kowhai-D hydraulic fracturing 2017-2018 (1.8 MB pdf) TAG Oil (NZ) Ltd Cheal-C hydraulic fracturing Wellsite location: Brookes Rd, Stratford. Report 2013-2015 (1.1 MB pdf) (single document only) Report 2013-2015 (1.1 MB pdf) Todd 'KA' wellsites hydraulic fracturing These Kapuni wellsites were previously operated by Shell Todd Oil Services. KA 1/7/19/20 hydraulic fracturing monitoring report 2016-2018