Your search for 'clean fill' returned 1770 results.

Hill Country Erosion Funding (STRESS)

in our waterways and marine environment. Who can apply?Hill country farmers can apply for Council funding to undertake soil conservation projects that meet project and funding criteria. To be eligible, farmers need to have a Council farm plan in place on their property. Once the agreed plan is developed, the farmer is eligible to apply for funding assistance to implement works that qualify. To request a Council farm plan or to apply for funding, fill out our contact form here and we will get back

Hill Country Erosion Funding (STRESS)

in our waterways and marine environment. Who can apply?Hill country farmers can apply for Council funding to undertake soil conservation projects that meet project and funding criteria. To be eligible, farmers need to have a Council farm plan in place on their property. Once the agreed plan is developed, the farmer is eligible to apply for funding assistance to implement works that qualify. To request a Council farm plan or to apply for funding, fill out our contact form here and we will get back

Westown Haulage (additional cleanfill) monitoring 2020-2021

the upper, southern portion of the gully, which does not contain the water body is proposed to be clean filled as shown in Figure 1. 2 The Council has used these compliance grading criteria for more than 17 years. They align closely with the 4lin compliance grades in the MfE Best Practice Guidelines for Compliance, Monitoring and Enforcement, 2018 page 4 Photo 1 Cleanfill face taken from a waterbody at the

Service stations

areas, to wash water from windscreen and forecourt cleaning, through to spills while filling underground tanks. Specific elements of hydrocarbon fuels and oils, such as polycyclic aromatic hydrocarbons (PAH’s), benzene, toluene, ethylbenzene and xylene (BTEX) are extremely hazardous when discharged into the environment. Each of these can cause both short and long term adverse effects even when discharged in small quantities. Experience shows that a majority of these pollutants gain

McKechnie Aluminium Annual Report 2022-2023

Henwood Road. This area was redeveloped during the creation of the SH3 Bell Block bypass. Transit NZ holds consents for the reclamation of part of the northern end of the lake (5801) and to discharge stormwater from road surface drainage into the lakes (5803). 1.2.2 Discharges to air In January 2008, a reconditioned gas fired furnace was installed which replaced the previous gas fired melting and holding furnaces. Only clean scrap is loaded into the new gas furnace, which discharges directly

Annual report 2014-2015

away from the cap and on-going monitoring requirements to manage potential slumping and/or cracking were discussed. It was agreed that one of the Directors would talk to the land owner about the final fill levels, how the capping requirements would be achieved and the approximate timings of works. This information would then be emailed to Council. 2 April 2015 The discharged wood waste appeared to be clean and free of any unacceptable material. It was noted that some slumping may have

Annual report 2014-2015

through the ponds. Additional stabilisation is recommended, for example by grassing areas that won't be filled for a while. The contractor advised that an attempt had been made to grass the area, however the wet soil conditions resulted in the work not being carried out. In the meantime adequate silt control needs to be installed upstream of the site boundary to prevent off site effects. The tributary was running clean and clear at the time of inspection. Photographs and a sample were taken. The

Annual report 2013-2014

report. Air discharge permit 1.4.4 Section 15(1)(c) of the RMA stipulates that no person may discharge any contaminant from any industrial or trade premises into air, unless the activity is expressly allowed for by a resource consent, a rule in a regional plan, or by national regulations. There is one air discharge consent associated with the cleanfills covered by this report, held by JW & TC Bailey. The consent covers emissions to air from clean filling and contains conditions that:

Annual report 2013-2014

fine at the time of the inspection with no rain falling over the past 48 hours. Monk Rd Site: The discharged wood waste appeared to be very clean and free of unacceptable wastes. The culvert under Monk Rd was discharging only contaminated spring water as there was no flow from the pond. Water samples were taken 20 m downstream of Monk Rd and at the culvert near the dairy shed. A discussion was held about how the fill was encroaching on the spring channels in the gully. One channel had

Route 12 - Merrilands to Spotswood

Street, Opunake | 7.30am-5pm Monday to Friday Links and downloads Get a Bee Card(external link) Bee Card FAQs Bee Card terms and conditions(external link) BEHAVIOUR ON THE BUS All students and other passengers must understand and comply with this code of conduct. All passengers have the right to: Fair treatment and respect. A friendly and efficient service. A safe, comfortable and clean environment when waiting or travelling. You are responsible for: Your belongings and personal effects. Your own