page
138 2015/2025 Long-Term Plan
Appendix 1: Resource Management Act Charging Policy
SCHEDULE OF CHARGES PURSUANT TO
SECTION 36 OF THE RESOURCE
MANAGEMENT ACT 1991
SCHEDULE 1: SCALE OF CHARGES FOR
STAFF TIME
Rate for
processing
resource
consents and
responding to
pollution
incidents.
Rate for
all other
Council
work.
Level 1 Senior management $338/hr $317/hr
Level 2 Managers/supervisors $157/hr $147/hr
undertaken during
and/or after the works;
accidental discovery protocol i.e. plan of action if penguins and/or nests are found
unexpectedly following commencement of work;
a contingency strategy if works are not completed within 3-4 weeks (to avoid key
avifauna seasons) due to conditions or other delays.
Response: Please refer to the Draft PMP provided in Appendix A.
This Penguin Management Plan (PMP) has been prepared in consultation with and/or with review by
the following
3.3 Evaluation of performance 16
3.4 Recommendations from the 2014-2015 Annual Report 19
3.5 Alterations to monitoring programmes for 2016-2017 19
4. Recommendation 21
Glossary of common terms and abbreviations 22
Bibliography and references 24
Appendix I Resource consents held by TAG Oil (NZ) Limited
Appendix II Air monitoring report
page
ii
List of tables
Table 1 Results for discharge monitoring from Sidewinder Production Station 8
Table 2
Plymouth District Council 30
Appendix II Biomonitoring surveys of spring 2013 and summer 2014 32
Appendix III NPDC report relating to oxidation pond levels and overflows during
the 2013-2014 period 34
page
ii
List of tables
Table 1 Dissolved oxygen measurements from the surface of the second section
of the Inglewood oxidation pond system adjacent to the outlet 9
Table 2 Inglewood oxidation pond system effluent: summary of analytical data
monitored by
for 2015-2016 18
3.4 Exercise of optional review of consent 18
4. Recommendations 19
Glossary of common terms and abbreviations 20
Bibliography and references 21
Appendix I Resource consent held by GPL 1
page
ii
Appendix II Certificates of analysis (Groundwater) 3
Appendix III Certificates of analysis (Hydraulic fracturing and return fluid) 5
Appendix IV Biomonitoring report 2
List of tables
Table 1 Summary of hydraulic
Rule 34 only prohibits burning for the purpose of waste disposal, not for the cooking (e.g. bbqs or hangi) or heating purposes (e.g.
brazier).
1 Defined urban areas are shown in Appendix II of the Plan.
More detailed funding forecasts
Legislative compliance aspects
Glossary
The
‘strategic
front end’
The
'funding bid'
The
'round up'
page
Page ii
CONTENTS
Foreword ......................................................................................................... i
Contents ......................................................................................................... ii
List of figures
More detailed funding forecasts
Legislative compliance aspects
Glossary
The
‘strategic
front end’
The
'funding bid'
The
'round up'
page
Page ii
CONTENTS
Foreword ......................................................................................................... i
Contents ......................................................................................................... ii
List of figures
4. Recommendations 24
Glossary of common terms and abbreviations 25
page
ii
Bibliography and references 27
Appendix I Resource consents held by Cheal Petroleum Ltd (For a copy of the signed
resource consent please contact the TRC consent department)
Appendix II Air monitoring reports
List of tables
Table 1 Consents for production activities at wellsites associated with Cheal
Production Station 8
Table 2 Results for discharge
24
Bibliography and references 27
Appendix I Resource consents held by Cheal Petroleum Limited
Appendix II Air monitoring reports
page
iii
List of tables
Table 1 Consents for production activities at wellsites associated with Cheal
Production Station 8
Table 2 Results for discharge monitoring from the Cheal Production Station (TRC
site IND001056) 12
Table 3 Results of receiving environment monitoring in relation to the Cheal