Greymouth Petroleum Ltd Southern Sites Annual Report 2022-2023

was potentially leaking, staff advised that this would be investigated in summer. Ngatoro G: the ring drain had been redefined and metal placed alongside it to help filter sediment. Kaimiro Production Station and Ngatoro-A: Heavy, persistent rain and strong winds had proceeded the inspection and it was noted that the stormwater system on both sites was working well. All stormwater was being collected and directed for treatment prior to discharge from the site. The sites were tidy and

Osflo Fertiliser Ltd Annual Report 2023 2024

inspection it was noted that the pedestrian entrances to the shed now had a protected doorway porch to prevent wind and rain from entering the shed. During each inspection a sample of the stream was obtained. The samples were clean and clear with no sheen or odour, iron oxide is naturally present in the stream. There was no discharge from the stormwater system to sample during any of the inspections. At the time of each inspection the Company were operating in compliance with their resource

Operations and Regulatory Committee Agenda November 2022

Rules 35 and 36 of the RFWP do not include any matters of control that expressly allow for the consideration of matters such as those expressed in the NPS-FM objective. Given that the Council can only consider policies that relate to the matters over which the Council has reserved control through the plan itself, the Council is unable to take into account matters that fall outside this scope. In terms of the notification assessment and when deciding whether a person is an affected person, the

SH3 Working Group brochure October 2024

were markedly improved on the approach to the Piopio South Passing Lane, and hazardous poplar trees were removed on outside of same curve. Example - Awakino Gorge Guardrail (2006) The guardrail was installed at the location of a number of crashes, and protects the corner for a distance of approximately 400m. There was also some replacement of square kerbing with radial. Mangaotaki Rockfall (2008) Heavy rain triggered a large rock fall on

Taranaki By Products Air and Water Annual Report 2022-2023

page 14 trap, near the Firewater Pond. The carpark area project was on-going and a digger was working by burial pit. The entrance to the old dairy factory on Old Normanby Road had traces of left over burial pit product in front of the entrance. TBP staff were advised that this needed attention, as it was forming a crust and heavy rain would likely cause it to discharge to the drain. A discussion was had about the importance of having underground drain plans and these were again

Concrete plants consent monitoring 2020-2021

page 9 3.2 Results 3.2.1 Inspections 08 December 2020 An inspection was undertaken to assess compliance with the wastewater discharge consent. A prolonged period of rain occurred prior to the inspection. The yard was relatively clean and tidy. No evidence of spills. The discharge of stormwater onsite into the roadside drain looked much improved from the last inspection. A sample of the settling pond discharge into the wetland was unable to be collected due to a new

Greymouth Turangi-C monitoring report 2016-2018

June 2027 9422-1 To discharge stormwater and sediment, deriving from soil disturbance undertaken for the purpose of constructing the Turangi-C wellsite. 5 February 2013 N/A 1 June 2017 1.3.1 Water abstraction permit Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. The