Dairy Discharge Monitoring Programme
Dairy Discharge Monitoring Programme - updated June 2021
Dairy Discharge Monitoring Programme - updated June 2021
Greymouth Petroleum Southern Sites Annual Report 2021-2022
Greymouth Deep Well Injection Annual Report 2021-2022
Kupe Production Station Annual Report 2021-2022
NPDC coastal structures consent monitoring report - Taranaki Regional Council.
outfall (this is now required by Condition 2 in consent 5079-2, which commenced on 26 June 2018). There were four separate exceedance events in relation to this limit in the 2017-2018 monitoring year. The first exceedance, which occurred in late July 2017, was associated with winter rains and lasted 7 days. The remaining three periods of exceedance occurred in September/October 2017 (20 days), April 2018 (4 days) and May 2018 (7 days), after continued heavy rainfall in spring 2017 and autumn 2018.
were observed to have plenty of available freeboard and the liners appeared in good order. Very little surface oil was visible in the pits and the area where muds had been applied was fenced off from stock. Pasture strike looked good throughout and appeared to be healthy. The ponded water in the low points from recent heavy rain was clear and free of hydrocarbon sheen. 4 June 2013 Upon inspection no objectionable odours or visible emissions were detected. All pits on site were found to
intensity. Too little rain and there is insufficient run-off to be sampled. Too much rain and the river rises above some of the stormwater discharge points, preventing sampling. The results of the discharge monitoring are discussed in the relevant section based on the consent holder responsible for that discharge, and the receiving water results are discussed in Section 16. The results of the full wet weather monitoring conducted during the 2014-2015 period are included in Appendix II.
TWN LP Waihapa production station consent monitoring report 2018-2019