Your search for 'rain fall' returned 1974 results.

Agenda

Agenda for Taranaki Regional Transport Committee March 2017

McKee Power Plant monitoring 2020-2021

page Water abstraction permits Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits authorising the abstraction of water are issued by the Council under Section 87(d) of the RMA. Water discharge permits Section 15(1)(a) of the RMA stipulates that no person may

Osflo Fertiliser Ltd monitoring report 2018-2019

the time of inspection the facility was operating within its consent conditions. At present Osflo remain on course to move all mixing and blending of material inside by the 1 June 2019. 15 January 2019 (Old site) An inspection was undertaken of the Osflo chicken litter storage and blending facility located at 70 Hursthouse Road. At the time of the inspection the weather was overcast, seven eighth cloud cover with a strong southerly breeze, rain had fallen the previous day. An odour

Patea Freezing Works detailed site investigation report

from the site, drains to the estuary and then into the Patea River. Flood potential Flooding of the site is extremely unlikely due to the large flow capacity of the Patea River. No mention of site flooding has been made to Council staff during the course of this investigation. It is likely, given the flat nature of the site, that heavy rain might cause superficial slight surface flooding of the site before drainage occurs. Boundary condition Boundary fencing was in extremely poor

Annual report 2014-2015

tonnes exported in 2013- 2014 and 209,100 freight tonnes exported in 2014-2015 (Photo 2). This move to bulk cargo has resulted in an increase in material deposited on the ground in the log and coal storage areas (Figure 1). When it rains this material is washed into the stormwater system, resulting in high suspended solids. In order to minimise deleterious effects on the receiving environment, Port Taranaki Limited implemented a number of preventative measures over the 2011-2014 period,

Regional Transport Committee agenda March 2018

the GPS. Resilience will fall under accessibility. SH maintenance funding is likely to remain the same, while SH improvement works funding will decrease. Spatial planning is likely to be made mandatory for each region in future. Regional Transport Committee - Minutes of the Regional Transport Advisory Group 20 page FRODO-#2019979-v1-Minutes_of_Taranaki_Regional_Transport_Advisory_Group (RTAG)_Meeting_7_March_2018 Page 3 of

Tamarind Sidewinder Annual Report 2020-2021

use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits authorising the abstraction of water are issued by the Council under Section 87(d) of the RMA. Water discharge permits Section 15(1)(a) of the RMA stipulates that no person may discharge any contaminant into water, unless the activity is expressly allowed for by a resource consent or a