Your search for 'rain fall' returned 2012 results.

Section 42A report for the hearing

coastal management area the activity may fall within. Officers further note that the potential risks associated with oil and gas exploration and production activities are well understood. In the main oil and gas exploration and production activities in the coastal marine area are largely a Discretionary Activity or a Non-complying Activity. Therefore, through the consenting process, Policy 3 and other relevant policies will be considered and applied as appropriate on a case-by-case basis.

Annual report 2015-2016

miscellaneous plant processes. 1.3 Resource consents 1.3.1 Water abstraction permit Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. SFF Waitotara held two permits to take water during the 2015-2016 review period. Water permit 2261-2 expired and was replaced with water permit 2261-3.

SH43 Investigation

infrastructure to add value to those travelling along it, and gain return investment from the visitor traffic.” The Developed Taranaki chapter includes the following section on the Forgotten World Highway: “Established in 1990 the Stratford to Taumarunui Heritage Trail promotes the rich history along the route linking Taranaki and the Central North Island. Branded the ‘Forgotten World Highway’ it threads through 155km of pristine scenic sub-tropical rain forests. In 2006 Venture Taranaki

Annual report 2015-2016

water quality sampling sites 2.1.3 Results of receiving environment monitoring 2.1.3.1 Chemical Receiving water quality sampling was undertaken in conjunction with discharge sampling at points upstream (PIK000159) and downstream (PIK000166) of the discharge. The results are presented in Table 2 and the sampling sites are shown in Figure 1. These sites were chosen because they provide safe access to the stream during periods of rain and are outside of the discharge mixing zone.

Biennial report 2012-2014

ground in the log and coal storage areas (Figure 1). When it rains this material is washed into the stormwater system, resulting in high suspended solids. In order to minimise deleterious effects on the receiving environment, Port Taranaki Limited implemented a number of preventative measures over the 2011-2014 period, including investing approximately $700,000 in an improved stormwater system. Photo 2 Logging trucks at Port Taranaki (provided by Paul Campbell, Port Taranaki)

STDC coastal structures monitoring 2019-2020

wooden safety barrier in place (Photo 12). This work was carried out because the structure was falling apart and no longer provided access to the beach; in contravention of resource consent 6736-1. At present, beach access is provided by the track that was excavated next to the original access point. page 15 Photo 12 Denby Road access to Waihi beach (left, 2019; right, 2020) 2.1.7 Patea River mouth structures Visible sections of the Patea River mouth structures were …