was in place and plants purchased form Council were on site
for this purpose. The monitoring of this last section of reinstatement was undertaken
by Council land management department which reports that the works had been
completed and that further plantings had been undertaken at various places around
the site. A copy of the riparian plan map is attached as Appendix II.
Overall the site was managed well and the extensive quarry reinstatement plantings
have continued.
2.2
performance for dam and diversion consent 5350-1 48
Table 12 Summary of performance for structures consent 5351-1 49
List of figures
Figure 1 Regional map of Taranaki showing the location of the Central landfill site 4
Figure 2 Aerial view of the Central landfill site and sampling points, up to June 2017 13
Figure 3 Increased Central landfill monitoring network, July 2017 onward 14
Figure 4 Central landfill surface water monitoring sites 16
Figure 5 Ammoniacal nitrogen levels
OMV Pohokura production station consent monitoring report 2018-2019
layout of Eltham wastewater treatment plant as
operational prior to the diversion of wastewater to the
Hawera WWTP in the 2010-2011 period 7
Figure 2 Aerial view of the Eltham WWTP showing the sludge geo-
textile bags disposal area 7
Figure 3 Location of sampling sites in relation to the Eltham
wastewater treatment system 22
Figure 4 Aerial location map 23
page
iv
List of photos
Photo 1 Overflow retention pond, 21 July 2011 8
Photo 2 Replacement aerator,
Table 1 presents a summary of median and maximum TAN results for each
surface water monitoring location, relevant obtained pH data equivalent to the
TAN statistic, and the consequent TAN concentration once recalculated to a pH
of 8.0.
A map of the monitoring locations presented in Table 1 is presented in Appendix
B.
page
7
R E M E D I A T I O N N E W Z E A L A N D L I M I T E D - U R U T I C O M P O S T I N G F A C I L I T Y – W A T E R Q U A L I T Y M A N A G
Table 27 Summary of compliance with consent 3900-2 over the 2018-2020 monitoring period 64
Table 28 Summary consent conditions for consent 10583-1 over the 2018-2020 monitoring period 69
Table 29 Summary of compliance with consent 1509-4 over the 2018-2020 monitoring period 70
List of figures
Figure 1 Map showing monitored quarrying locations in Taranaki 5
Figure 2 AA Contracting Ltd quarry site 12
Figure 3 Map of Jones Quarry Ltd Kekeua Road quarry, showing Mangaone …
maps, photographs, GPS and map references on
the internal electronic TRC site reference system (ESAM) which is integrated into the existing LAB water quality
computer and Taradise GIS databases.
A brief description of all sites in the Taranaki Regional Council and NIWA programmes follows.
Site Maketawa Stream at Tarata Road
This site, in the lower reaches of a developed farmland catchment is representative of a sub-catchment of the
Manganui and Waitara Rivers catchments, with valued
of water irrigation allocation per activity in the Taranaki region 4
Figure 2 Source of water for irrigation in Taranaki during the 2019-2020 period 4
Figure 3 Total consented water abstractions – distributed by activity 2019-2020 4
Figure 4 Pasture irrigation zones and locations of consented irrigation in Taranaki 5
Figure 5 Distribution map of the total rainfall recorded from 1 October 2019 to 31 March 2020 10
List of photos
Photo 1 Picture depicting k-line long …
Fonterra Kapuni Annual Report 2022-2023
e.g. SH3. The expansion of Bell Block towards the
poultry farm is well illustrated in the PDP maps below in Figure 1.
Figure 1: Application Site shown in black and white hatching. Yellow is
residential zone (purple outlined yellow area is Area Q). Grey is Special Purpose
– Future Urban Zone (Area R).
1 Paragraph 5.3, Odour Assessment
page
6
Changes since consent was granted in 2011
23. Since the current consents