Your search for 'iwi map' returned 2244 results.

Remediation NZ Ltd Waitara Road Facility Annual Report 2020 2021

interventions summary table 11 Table 4 Summary of performance for consent 5892-2 13 Table 5 Evaluation of environmental performance over time 14 List of figures Figure 1 RNZ Waitara Road Facility map 4 Figure 2 Consent 5892-2 stormwater flow direction 5 page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is for the period July 2020 to June 2021 by the Council

Malandra Downs consent monitoring 2018-2019

List of figures Figure 1 Regional map showing the location of the site 4 Figure 2 Aerial image of the Malandra Downs property disposal area 4 page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is for the period July 2018 to June 2019 by the Taranaki Regional Council (the Council) on the monitoring programme associated with the resource consent held by Malandra Downs Ltd

Pātea Beach greenwaste monitoring 2018-2019

Patea Beach green waste discharge List of tables Table 1 Summary of consents held by the company during the period under review 5 Table 2 Summary of performance for consent 6088-3 8 Table 3 Summary of consent performance over time for Patea Beach green waste discharge 9 page ii List of figures Figure 1 Regional map showing the location of the Patea green waste site 4 Figure 2 Aerial view of the Patea Beach green waste disposal area 4 List of

Pātea Beach green waste monitoring 2017-2018

terms and abbreviations 14 Bibliography and references 15 Appendix I Resource consents held by STDC Patea Beach green waste discharge List of tables Table 1 Summary of performance for consent 6088-3 10 Table 2 Summary of consent performance over time for Patea Beach green waste discharge 11 page ii List of figures Figure 1 Regional map showing the location of the Patea green waste site 4 Figure 2 Aerial view of the Patea Beach green waste

Annual report 2016-2017

to monitoring programmes for 2017-2018 12 4 Recommendation 13 Glossary of common terms and abbreviations 14 Bibliography and references 15 Appendix I Resource consent held by Malandara Downs page ii List of tables Table 1 Summary of performance for consent 7374-1.4 11 List of figures Figure 1 Regional map showing the location of the site 4 Figure 2 Aerial image of the Malandra Downs property disposal area 4 List of photos

Annual report 2015-2016

programmes for 2016-2017 14 4. Recommendations 16 Glossary of common terms and abbreviations 17 Bibliography and references 18 Appendix I Resource consents held by STDC Patea Beach – green waste discharge page ii List of tables Table 1 Summary of performance for consent 6088-3 13 List of figures Figure 1 Regional map showing location of the Patea green waste site 5 Figure 2 Aerial view of the Patea Beach green waste disposal area 5

Inhalable particulates (PM10) regional monitoring 2010

3.4 Correlation of results with traffic counts 13 3.4.1 Traffic counts versus PM10 results 13 3.5 Future monitoring requirements for PM10 15 4. Recommendations 16 Bibliography and references 17 Appendix I Aerial map of New Plymouth CBD 19 Appendix II Wind rose and numerical wind statistics for the duration of monitoring 23 page ii List of tables Table 1 Summary of PM10 results 8 Table 2 Comparative results of other PM10 monitoring in the Taranaki region 9

Annual report 2014-2015

for consent 6088-3 11 List of figures Figure 1 Regional map showing location of the Patea green waste site 4 Figure 2 Aerial view of the Patea Beach green waste disposal area 5 page page 1 1. Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is for the period July 2014-June 2015 by the Taranaki Regional Council (the Council) on the monitoring

Kupe PS consent monitoring 2017-2018

practicable option to minimise adverse environmental effects. Condition 7 requires all works shall comply with noise standards. Condition 8 requires the consent holder to survey and map the position of the structures. Condition 9 requires the consent holder undertake pre and post-lay surveys of the pipeline corridor. Condition 10 states that the structure shall be removed and the area reinstated, if and when it is no longer required. Conditions 11 and 12 are lapse and review

Annual report 2016-2017

summer effluent monitoring for the Waverley WWTP 54 Table 28 Dissolved oxygen measurements from the Waverley WWTP 55 Table 29 Chlorophyll-a levels and primary pond appearance 56 Table 30 Sampling sites for Waverley WWTP 56 page v Table 31 Low flow receiving water results February 2017 57 Table 32 Summary of performance for consent 0072-2 60 Table 33 Summary of performance for consent 6621-1 60 List of figures Figure 1 Aerial location map of