interventions summary table 11
Table 4 Summary of performance for consent 5892-2 13
Table 5 Evaluation of environmental performance over time 14
List of figures
Figure 1 RNZ Waitara Road Facility map 4
Figure 2 Consent 5892-2 stormwater flow direction 5
page
1
1 Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 Introduction
This report is for the period July 2020 to June 2021 by the Council
List of figures
Figure 1 Regional map showing the location of the site 4
Figure 2 Aerial image of the Malandra Downs property disposal area 4
page
1
1 Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 Introduction
This report is for the period July 2018 to June 2019 by the Taranaki Regional Council (the Council) on the
monitoring programme associated with the resource consent held by Malandra Downs Ltd
Patea Beach green waste discharge
List of tables
Table 1 Summary of consents held by the company during the period under review 5
Table 2 Summary of performance for consent 6088-3 8
Table 3 Summary of consent performance over time for Patea Beach green waste discharge 9
page
ii
List of figures
Figure 1 Regional map showing the location of the Patea green waste site 4
Figure 2 Aerial view of the Patea Beach green waste disposal area 4
List of
terms and abbreviations 14
Bibliography and references 15
Appendix I Resource consents held by STDC Patea Beach green waste discharge
List of tables
Table 1 Summary of performance for consent 6088-3 10
Table 2 Summary of consent performance over time for Patea Beach green waste discharge 11
page
ii
List of figures
Figure 1 Regional map showing the location of the Patea green waste site 4
Figure 2 Aerial view of the Patea Beach green waste
to monitoring programmes for 2017-2018 12
4 Recommendation 13
Glossary of common terms and abbreviations 14
Bibliography and references 15
Appendix I Resource consent held by Malandara Downs
page
ii
List of tables
Table 1 Summary of performance for consent 7374-1.4 11
List of figures
Figure 1 Regional map showing the location of the site 4
Figure 2 Aerial image of the Malandra Downs property disposal area 4
List of photos
programmes for 2016-2017 14
4. Recommendations 16
Glossary of common terms and abbreviations 17
Bibliography and references 18
Appendix I Resource consents held by STDC Patea Beach – green waste discharge
page
ii
List of tables
Table 1 Summary of performance for consent 6088-3 13
List of figures
Figure 1 Regional map showing location of the Patea green waste site 5
Figure 2 Aerial view of the Patea Beach green waste disposal area 5
3.4 Correlation of results with traffic counts 13
3.4.1 Traffic counts versus PM10 results 13
3.5 Future monitoring requirements for PM10 15
4. Recommendations 16
Bibliography and references 17
Appendix I Aerial map of New Plymouth CBD 19
Appendix II Wind rose and numerical wind statistics for the duration of monitoring 23
page
ii
List of tables
Table 1 Summary of PM10 results 8
Table 2 Comparative results of other PM10 monitoring in the
Taranaki region 9
for consent 6088-3 11
List of figures
Figure 1 Regional map showing location of the Patea green waste site 4
Figure 2 Aerial view of the Patea Beach green waste disposal area 5
page
page
1
1. Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 Introduction
This report is for the period July 2014-June 2015 by the Taranaki Regional Council (the
Council) on the monitoring
practicable option to minimise adverse
environmental effects.
Condition 7 requires all works shall comply with noise standards.
Condition 8 requires the consent holder to survey and map the position of the structures.
Condition 9 requires the consent holder undertake pre and post-lay surveys of the pipeline corridor.
Condition 10 states that the structure shall be removed and the area reinstated, if and when it is no longer
required.
Conditions 11 and 12 are lapse and review
summer effluent monitoring for the Waverley WWTP 54
Table 28 Dissolved oxygen measurements from the Waverley WWTP 55
Table 29 Chlorophyll-a levels and primary pond appearance 56
Table 30 Sampling sites for Waverley WWTP 56
page
v
Table 31 Low flow receiving water results February 2017 57
Table 32 Summary of performance for consent 0072-2 60
Table 33 Summary of performance for consent 6621-1 60
List of figures
Figure 1 Aerial location map of