boiler & pipework—4 weeks
Baptist Church, Papakura, Crocidolite to Ceiling—4 weeks
CEPI, plant room 1 week
Thames school, Amosite boiler & pipework—3 weeks
2000—Consulting & Management for Opus Consultants
Hamilton Boys High, Amosite boiler & pipework—2 months
Whakatane High School, Amosite pipework—3 weeks
Thames Hospital, Amosite Debris cleanup—3 weeks
Coromandel Police station, Amosite pipework—1 week
Nga Iwi Primary school, Mangere, Amosite Pipework—3 weeks
Thames High School,
of performance for consent 7374-1.5 10
Table 4 Evaluation of previous environmental performance over time 11
List of figures
Figure 1 Regional map showing the location of the site 3
Figure 2 Aerial image of the Malandra Downs property 3
Figure 3 Large pit dug for recreational purposes 1st September 2023 5
Figure 4 Coastal discharge located onsite 1st September 2023 6
Figure 5 Malandra Downs site in 2007 8
Figure 6 Aerial image showing the extent of the sand
activity
and its discharges, an aerial photograph or map showing the location of the activity, and an outline of the
matters covered by the company’s air discharge permit.
Subsection 1 provides a process description for each company.
Subsection 2 presents the results of monitoring of the company’s activities during the period under review,
including scientific and technical data.
Subsection 3 discusses the results, their interpretation, and their significance for the environment in the
figures
Figure 1 Regional map showing the location of the Patea green waste site 3
Figure 2 Aerial view of the Patea Beach green waste disposal area 3
List of photos
Photo 1 Patea green waste site inspection on 7 June 2023 5
page
1
1 Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 Introduction
This report is for the period July 2022 to June 2023 by the Taranaki Regional Council (the Council) on the
objectives and limits in water
policy. I have provided evidence in these topic areas before the Environment Court,
and in Board of Inquiry and council hearings processes across the country.
page
4
5. I have provided ecological, water quality and freshwater policy advice to Nelson City
Council, Northland Regional Council, Horizons Regional Council, Ngāti Kahungunu
Iwi Incorporated, Ngāti Pāhauwera Development Trust, Te Rōpū Taiao o Ngāti
Whakatere, Te Taiwhenua o
environmental performance over time 20
List of figures
Figure 1 Location map 5
Figure 2 Location of biomonitoring sites in relation to the Turangi-A wellsite 17
page
1
Introduction
Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 Introduction
This report outlines and discusses the results of the monitoring programme implemented by Taranaki
Regional Council (the Council) in relation to the programme of hydraulic fracturing
Stratford District Council, provided a presentation updating on active
modes in the Stratford District.
7.3 Mrs C Symes, South Taranaki District Council, provided a presentation updating on
active modes in the South Taranaki District.
7.4 Ms C Littlewood, Taranaki Trails Trust, provided an update on activities undertaken
by the Taranaki Trails Trust and a draft map was provided for discussion purposes.
7.5 It was noted that the proposed tracks and trails shown on the map are very …
Park
page
13
1 Introduction
Landcare Research (NZ) Ltd was contracted by Taranaki Regional Council (TRC) in 2009
to map areas of severe erosion and deposition in the upper Stony River catchment, Egmont
National Park. The Stony is the most extreme example of a number of catchments draining
Mt Taranaki/Egmont that are experiencing severe, and apparently worsening, erosion in
their headwaters, presenting consequent aggradation problems to farming and
infrastructure lower down on
........................................................................................................................... 43
Takohanga mō te hauora me te marutau - Health and safety responsibilities ....................... 44
Hokinga mai o ngā tūhinga pōti 2022 - 2022 voting document returns ...................................45
Otinga pōti 2022 - 2022 election results ........................................................................................... 48
Mahere - Maps
1389-3 13
Table 11 Evaluation of environmental performance by NPDC over time 14
List of figures
Figure 1 Map of sampling sites and other features of interest at Urenui Beach Camp 5
Figure 2 Map of sampling sites and other features of interest at Onaero Bay Holiday Park 6
Figure 3 Supplied flow meter data from NPDC for Urenui Beach Camp (01 July 2021 – 30 June 2022) 8
Figure 4 Supplied flow meter data from NPDC for Onaero Bay Holiday Park (1 July 2021– 30 June
2022) 10