or chronic exposure guidelines in 21 of 24 results. Suspended
solids were found to be above median at all sites (including at the upstream control site)
however in all sampling surveys there was found be only slight increases in the
concentration of suspended solids between the upstream control site and the site
immediately below New Plymouth District Council’s (NPDC’s) treatment ponds at the
page
bottom of the industrial catchment. Concentrations of ammoniacal
scientific terms, and a bibliography, are
presented at the end of the report.
1.1.3 The Resource Management Act 1991 and monitoring
The RMA primarily addresses environmental ‘effects’ which are defined as positive or
adverse, temporary or permanent, past, present or future, or cumulative. Effects may
arise in relation to:
(a) the neighbourhood or the wider community around an activity, and may include
cultural and social-economic effects;
(b) physical effects on the locality,
programmes carried out by the Council.
page
2
1.1.3 The Resource Management Act (1991) and monitoring
The RMA primarily addresses environmental ‘effects’ which are defined as positive
or adverse, temporary or permanent, past, present or future, or cumulative. Effects
may arise in relation to:
(a) the neighbourhood or the wider community around an activity, and may include
cultural and socio-economic effects;
(b) physical effects on the locality, including landscape,
on
5 December 2013 13
Table 3 Summary of performance for 9616-1 to take groundwater as ‘produced
water’, during hydrocarbon exploration and production activities at
the Cheal-G wellsite 21
Table 4 Summary of performance for 9613-1 to discharge contaminants to air
from hydrocarbon exploration at the Cheal-G wellsite, including
combustion involving flaring or incineration of petroleum recovered
natural deposits, in association with well development or
redevelopment and testing or
2013-2014
monitoring period. In total 104,967 cubic metres (m3) of fluids were discharged under
consent 4094-2. Consent 3688-2 was not exercised during the 2013-2014 monitoring period.
An assessment of process data provided by the consent holder and data gathered during
Council inspections do not indicate any potential issues with the integrity of the injection
well or the injection zone.
Groundwater monitoring carried out by the Council in the vicinity of the Waihapa-F wellsite
does not
1.1.3 The Resource Management Act 1991 and monitoring
The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or
permanent, past, present or future, or cumulative. Effects may arise in relation to:
a. the neighbourhood or the wider community around an activity, and may include cultural and social-
economic effects;
b. physical effects on the locality, including landscape, amenity and visual effects;
c. ecosystems, including effects on
conditions. Receiving water inspections and sampling showed that the discharges were not
causing any adverse effects on the Ngaere Stream.
There were no adverse effects on the environment resulting from the exercise of the air
discharge consent. The ambient air quality monitoring at the site showed that levels of carbon
monoxide, combustible gases, PM10 particulates and nitrogen oxides were all below levels of
concern at the time of sampling. No offensive or objectionable odours were detected
from composting
operations.
page
6. The Regional Air Quality Plan (RAQP) includes the following definitions:
Waste management processes means the treatment and disposal of any
waste by combustion, composting, the depositing of waste into or onto land
set apart for that purpose, or other processes intended to allow or facilitate
such disposal.
Composting means the biological reduction of organic waste to a relatively
stable product.
7. The application is to compost,
Resources New Zealand Limited demonstrated
a high level of environmental performance and a high level of administrative performance
and compliance with the resource consents. The Council did not receive any complaints or
register any unauthorised incidents associated with any of the Company’s DWI activities
during the 2013-2014 monitoring period.
page
For reference, in the 2013-2014 year, 60% of consent holders in Taranaki monitored through
tailored compliance monitoring
at the end of the report.
1.1.3 The Resource Management Act (1991) and monitoring
The Resource Management Act primarily addresses environmental `effects' which are
defined as positive or adverse, temporary or permanent, past, present or future, or
cumulative. Effects may arise in relation to:
(a) the neighbourhood or the wider community around a discharger, and may include
cultural and socio-economic effects;
(b) physical effects on the locality, including landscape, amenity and