Your search for 'vision mission goals of Taranki Region Council'' returned 5137 results.

Wastewater treatment & disposal

These reports cover large-scale municipal systems and as well as those serving small communities. NPDC Inglewood waste water treatment plant Treated wastewater from the Inglewood ponds is piped to the New Plymouth wastewater treatment plant most of the time; NPDC holds one consent allowing for intermittent wet-weather overflows of treated wastewater to the Kurapete Stream. NPDC Inglewood WWTP Annual Report 2022-2023 (651 KB PDF) More reports NPDC Inglewood WWTP Annual Report 2022-2023 (651 KB

Route 19 and 20 Waitara services timetable Jan 2025

Block Does not go to The Valley ABC Queen StBell Block Parklands Bell Block School The Valley RJ Eagars Fitzroy Depart Ariki St E D D R20 NP/Bell Block/Waitara Starts 7.10AM from Richmond St Citylink is operated by Tranzit Coachlines with the support of Taranaki Regional Council Times in BOLD are scheduled, all other times are approximate CURRENT 2025-01-29 Ph 0800 87 22 87 www.taranakibus.info TaranakiPublicTransport OGLE STOGLE STOGLE ST NORMAN ST P

DOC series traps - Department of Conservation

page DOC Series Traps History & Development page 2 Fenn traps. 1970’s – 2000’s. page 3 Te Urewera mainland island. Double Mk6 Fenns. page 4 Advent of current best practice – Kiwi Zones. page 5 Fenn traps fail NAWAC Humane Kill Trap Standard. Pre 2003. page 6 Trapper 90 – Sweden. 2003. page 7 Swedish Potato Masher – DOC 180. (DOC 200 passes NAWAC) page 8 DOC series traps

Appendix 8: Inspection of tanks & vessels

page File note 6 May 2008 Document: 452953 Patea Freezing Works – Inspection of tanks and vessels A number of tanks and vessels have been identified and viewed on the site. Inspection of those that were safely accessible, indicate that most have corroded to the point where they are holed. Taking into account the time lapsed since the plant was closed, it is considered reasonable to assume that none still contain any liquid residues. However the presence of solid chemical

Part 2 of the Resource Management Act

page 03/15 - # 1473368-v1 Part 2 of Resource Management Act 1991 5 Purpose (1) The purpose of this Act is to promote the sustainable management of natural and physical resources. (2) In this Act, sustainable management means managing the use, development, and protection of natural and physical resources in a way, or at a rate, which enables people and communities to provide for their social, economic, and cultural well-being and for their health and safety while—

Greymouth Petroleum Ltd Northern Sites Annual Report 2022-2023

This report for the period July 2022 to June 2023 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance performance during the period under review. The report also details the results of the monitoring undertaken and assesses the environmental effects of the Company’s activities. During the monitoring period, Greymouth Petroleum Ltd demonstrated a good level of environmental performance and

Port Taranaki Industries Annual Report 2022-2023

gas. This report for the period July 2022 to June 2023 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the environmental and consent compliance performance of the various companies operating in and around Port Taranaki, New Plymouth. The report also details the results of the monitoring undertaken and assesses the environmental effects of the Company’s activities. During the year, Port Taranaki demonstrated a good level of

Tamarind NZ Onshore Ltd Sidewinder Production Station Annual Report 2022-2023

programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental performance and compliance with its three resource consents during the period under review. The report also details the results of the monitoring undertaken and assesses the environmental effects of the Company’s activities. During the year, the Company demonstrated a good level of environmental performance and a high level of administrative compliance with the resource consents The

Taranaki's happy travellers

A recent customer satisfaction survey across our Connector, Citylink and Southlink services has shown positive results. ConnectorThe Connector runs four return services from Hāwera to New Plymouth each weekday, with extensions from and to Opunake on the first and final trips respectively. All passengers surveyed were satisfied overall with the service as well as the availability of information about timetables and routes, with 93% reporting they found the driver to be helpful. Of those