Your search for 'rates' returned 2321 results.

Officer Report Opunake Power Limited 15 March 2022

RFWP Rule 43 caption _Ref53651562 Table 1 : Resource Consents applied for and relevant regional plan rule _Toc98245831 Consent 1795-5.0: Take water from the Waiaua River numbered_Paras This is straightforward intake of water from behind the weir and is described in section 2 above. The expired consent specified a maximum take of 3900 L/s but there is no metering of the take rate so compliance with this condition has never been monitored. We assume that his limit is based on the

Stanley Bros Piggery consent monitoring 2019-2020

the Company, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with the Company’s approach to demonstrating consent compliance in site operations and management including the timely provision of information to Council (such as …

TRC Southern Hill Country FMU Consultation Document September 2023

Ecosystem health is variable throughout the Southern Hill Country FMU. Nitrogen levels are generally low, but elevated in-stream concentrations of dissolved reactive phosphorous are found in the majority of rivers, along with high rates of sedimentation, which impact aquatic ecosystems. Periphyton is monitored at one site, with occasional blooms occurring, although there is limited data to provide a comprehensive picture of algal growth across this FMU. Macroinvertebrate community

Annual report 2015-2016

to minimise the generation of wastewater, but this could be further improved. The discharge of wastewater into the Kahouri Stream did not cause any recorded impact on the macroinvertebrate communities of this stream, and the impact on water quality was minimal. However, discharge rates to the Kahouri Stream need to be reduced to ensure a 1:100 dilution. The irrigation of wastewater was undertaken with no significant adverse effects on the environment, but further improvement regarding

Report and decision on Taranaki By-Products Ltd irrigation to land (2009)

monitor the loading rates on the land irrigated to ensure compliance with the existing consent conditions. 18. Mr Chapman stated that TBP has recently made improvements to the irrigation system including an upgrade to a three pump system and the replacement of timers on the irrigators to ensure more careful management of the discharge. It was also explained that frequent sampling of treated wastewater is undertaken by TBP and measured at an independent water testing facility in order to

Annual report 2016-2017

Taranaki By-Products groundwater monitoring well locations 19 Figure 4 Consent 2051-4 surface water abstraction data, Inaha Stream 2016-2017 monitoring year 24 Figure 5 Daily groundwater abstraction volumes consent 9756-1 TBP 2016-2017 25 Figure 6 Hydrograph for Inaha Stream at Kohiti Road July 2016-June 2017 with overlay of pond 6 discharge rate 33 Figure 7 Cooling water temperature 2016-2017 34 Figure 8 Inaha Stream temperature increase post discharge 2016-2017 35 Figure 9

Appendix H - Uruti composting facility management plan

review can be summarised by the following main points:  Surface soils across the site are dominated by semi-porous silty clay-loams, overlying more impervious clay soils  Soils below 2000 mm have not been characterised  Chloride concentrations in the soil beneath the irrigation zone are highly elevated compared to non-irrigated areas  The shallow groundwater table is in direct connection with semi-porous loamy silty-clay  Due to high rates of irrigation loading, shallow

Annual report 2010-2011

Freshwater ecological monitoring state of the environment report - Taranaki Regional Council.

Form 520: Certificate of compliance

rates notice) _________________________________________________________________________________ _________________________________________________________________________________ 2.5 Assessment/Valuation number of property (refer to land title or rates notice) _____________________________________________________________________________________________________ 2.6 Name of closest river or stream to the works? page 06/22- #650412 Page 4 of 8