Your search for 'rates' returned 2336 results.

Annual report 2016-2017

environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the consent holders, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with the Company’s approach to

Annual report 2014-2015

Council for monitoring of groundwater abstraction was installed in September 2014. The new system showed that the instantaneous volume limit was breached frequently by small amounts, although the daily limit was met, with one exception. The Company has applied for a higher instantaneous abstraction rate in the consent replacement process. In September 2012, the Company commissioned a 20.7 ha extension of the irrigation area, and a further extension of 6.0 ha became operational in January 2013.

Todd Kapuni Gas Treatment Plant KGTP Annual Report 2020 2021

extent of compliance by the Company, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with the Company’s approach to demonstrating consent compliance in site operations and management including the timely provision of information to

Biennial report 2013-2015

included 24 inspections, 343 water samples collected for physico-chemical analysis, and four bio-monitoring surveys of receiving waters. In addition, continuous monitoring of the temperature of cooling water discharged and of the Inaha Stream was undertaken, and a staff gauge rating was maintained for measurement of flow in the stream. There was a fire at the inedibles plant on 12 January 2014, which affected the operation of the plant and the monitoring undertaken for about 12 weeks. The

Regional Public Transport Plan 2020-2030

describes how the council is to deliver the outcomes agreed to by the local community, the level of rates expected for the first three years of the LTP and other information pertinent to the community. One aspect of a LTP is to set out public transport activities and funding sources for the next ten years Taranaki 2050 Roadmap In August 2019, Taranaki launched a co-designed Roadmap for how the region will transition to a low-emissions economy by 2050. A collaborative process has

Annual report 2016-2017

management and, ultimately, through the refinement of methods and considered responsible resource utilisation, to move closer to achieving sustainable development of the region’s resources. Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the Trust, this report also assigns a rating as to their environmental and administrative performance during the period under review. Environmental performance

Form 111: Discharge stormwater to water or land (including Coastal Marine Area)

_________________________________________________________________________________ 3.4 Map Co-ordinates at point of discharge (either Longitude/Latitude or NZTM): ________________________ Longitude ________________________ Latitude OR ________________________ E ________________________ N (NZTM) 3.5 Legal description of property at site of activity (refer to land title or rates notice) _________________________________________________________________________________

Annual report 2015-2016

to minimise the generation of wastewater, but this could be further improved. The discharge of wastewater into the Kahouri Stream did not cause any recorded impact on the macroinvertebrate communities of this stream, and the impact on water quality was minimal. However, discharge rates to the Kahouri Stream need to be reduced to ensure a 1:100 dilution. The irrigation of wastewater was undertaken with no significant adverse effects on the environment, but further improvement regarding

Eltham waste water plant monitoring 2020-2021

enables the Council to continually re-evaluate its approach and that of consent holders to resource management and, ultimately, through the refinement of methods and considered responsible resource utilisation, to move closer to achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the Company, this report also assigns them a rating for

Long-Term Plan hearing agenda

submitters who wish to present their submission, to consider all of the submissions received and make recommendations on all of the submissions. 8. As a result of the decisions made, the 2021/2031 Long-Term Plan will be finalised, audited and presented for adoption at the Council’s Ordinary Meeting on 18 May 2021. It is proposed to set the rates for 2021/2022 at the same Ordinary Meeting. Options 9. At this stage of the process, there is only one viable option being the consideration