Your search for 'rates' returned 2321 results.

Waikaikai Landfarm consent monitoring 2019-2020

performance and extent of compliance by the Company, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with the Company’s approach to demonstrating consent compliance in site operations and management including the timely provision of …

Ballance Kapuni consent monitoring 2018-2019

Intake options report and monitoring programme 11 2.1.2.4 Annual meeting regarding the Waingongoro River intake and environmental performance 12 2.1.3 Discharge monitoring 12 2.1.3.1 Stormwater and raw water treatment discharges 12 2.1.4 Receiving environment monitoring 16 2.2 Land 17 2.2.1 Inspections 18 2.2.2 Discharge monitoring 19 2.2.2.1 Effluent volume 19 2.2.2.2 Nitrogen application rates 19 2.2.2.2.1 Cut-and-carry areas 19 2.2.2.2.2 Grazed areas 19

Trustpower Pātea Hydro consent monitoring 2018-2019

consent requirements for the vast majority of the period being reported. During the reported period, the Company was fully compliant with their residual flow limits, lake levels, and the rise and recession rate restrictions for the lower Patea River. The Company was required to coordinate a number of investigations and reports during the reporting period. The bulk of the monitoring work required in relation to these was undertaken prior to the 2017-2018 period and those results have been

Civil Quarries consent monitoring report 2018-2019

methods and considered responsible resource utilisation, to move closer to achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the Company, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely

Trustpower Ltd Motukawa HEP Scheme Annual Report 2020 2021

List of tables Table 1 Summary of consents held by the Company for the Motukawa HEP scheme 5 Table 2 Gauging results for gaugings undertaken in relation to the Manganui River residual flow 12 Table 3 Details of consents and special conditions in relation to abstraction rates, discharge rates and water levels and the recording 13 Table 4 Summary of summer Manganui River daily water temperatures (°C) prior to the increase in residual flow to 400 L/s (1992-2002) and for the years since,

Regional Cleanfill Annual Report 2022-2023

their performance, while the remaining one (<1%) achieved a rating of poor. This report includes recommendations for the 2023-2024 monitoring period page Table of contents Page 1 Introduction 1 Compliance monitoring programme reports and the Resource Management Act 1991 1 Introduction 1 Structure of this report 1 The Resource Management Act 1991 and monitoring 1 Investigations, interventions, and incidents 2 Evaluation of

Form 110: Discharge contaminants to water or land (including Coastal Marine Area)

2.2. Location of activity (Including: Street/road name, number, and locality): _________________________________________________________________________________ _________________________________________________________________________________ 2.3. Legal description of property at site of activity (refer to land title or rates notice): _________________________________________________________________________________ 2.4. Assessment/Valuation number of property

Rimu PS Consent Monitoring 2021-2022

sustainable development of the region’s resources. 1.1.4 Evaluation of environmental performance Besides discussing the various details of the performance and extent of compliance by the consent holders, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both environmental and administrative performance. The interpretations for these ratings are

Application Attachment Appendix C Hydrology Assessment Manawa Energy 14 Feb 2023

rainfall for the Waitara catchment is expected to be about 2,200 mm. A catchment-wide mean annual rainfall of about 3,200 mm is estimated for the Manganui River based on the recorded mean flow at Everett Park (19.5 m3/s). In a normal year, significant rainfall occurs in every month of the year, with the three months from January to March receiving roughly 30% less rainfall than other months on average. This lower rainfall period coupled with the higher temperatures and evapo-transpiration rates in