Your search for 'rates' returned 2325 results.

Remediation hearing - applicant's evidence - expert evidence (economic)

Economic Profile – GDP measured in 2020 prices. 3 Measured as the Modified Employment Count (MEC) to include both employees and working proprietors page Page | 6 20. New Plymouth is the dominant city in the region (with two-thirds of regional population), with a network of rural service towns. Taranaki Region’s population reached 124,600 people in 2020. Between 2000 and 2020 the region’s population grew by 0.8% per annum, a lower rate than national

TRC Patea Catchment FMU Consultation Document September 2023

irrigation or municipal water supply to enable them to comply with any consent limits. It is also important for ensuring that water allocated for use is done so in a way that provides for other freshwater values, such as ecosystem health. Under the NPS-FM, water use is managed by setting environmental flows and levels, taking into account any changes that are likely to occur as a result of climate change. Limits can then be set on the rate and amount of water taken, and where and when

Annual report 2015-2016

approach and that of consent holders to resource management and, ultimately, through the refinement of methods and considered responsible resource utilisation, to move closer to achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the Company, this report also assigns them a rating for their environmental and administrative

MOSCP19 Chapter2

estimated rate of release: SOURCE OF OIL SPILT Vessel  Offshore Installation Pipeline  Unknown  ACTIVITY Vessel Loading/Unloading  Refuelling  Bilge Pumping  Collision  Production water  Unknown  Other (details)  CAUSE Equipment/Mechanical Failure  Human Error  Vandalism  Negligence  Unknown  Other (details)  ENVIRONMENTAL EFFECTS/DAMAGE RESPONSE/ACTION TAKEN COULD SPILL ESCALATE? Y/N

Transforming Taranaki 2019

special advantage is being aware of the rate and magnitude of change on the landscape, especially when the change is for the better. I first became interested in indigenous nature in Taranaki 60 years ago and began formally documenting ecosystems, particularly in Egmont National Park, more than 40 years ago. It was possible in those earlier days to swim in and drink from waterways without any danger of a stomach complaint. And kōkako, kiwi and whio could still be encountered in

Appendix 9: Investigation of existing bores

260 Pump Type: Unknown Construction: Drilled - open ended casing Aquifer: Whenuakura Aquifer Type: Unknown WQ Data: Bore Use: Industrial (Commercial) Pump Test Data Location: Top of Screen: Bottom of Screen:0.0 0.0 Casing 1: Casing 2: High Static Water Level: Low Static Water Level:8.2 15.2 Comments: PUMPING RATE 627.35L/MIN 60.96M AIR PIPE 50.8mm DIAMETER PUMP DEPTH 36.57M WATER QUALITY CHLORIDE= 60ppm SALT = 99ppm 79.2 No lithological data available

Site 65

of riding in a car. It aims to get people out of their cars and onto the city’s spectacular shared pathways and streetscapes by making walking and cycling the easiest transport options. Let’s Go in New Plymouth The government, which provides money from the New Zealand Transport Authority through taxes, road user charges and motor vehicle and licensing fees. Ratepayers, who contribute through a special , collected by the Taranakitransport rate Regional Council.

RKM Farms monitoring report 2017-2018

its approach and that of consent holders to resource management and, ultimately, through the refinement of methods and considered responsible resource utilisation, to move closer to achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the consent holder, this report also assigns them a rating for their environmental and