Your search for '72' returned 957 results.

Lower Waiwhakaiho air discharges 2020-2021

Programme demonstrated a high level of environmental performance. The companies monitored during the period under review were Downer EDI Works Ltd, Dialog Fitzroy Ltd, and Katere Surface Coatings Ltd. The companies hold three resource consents, which include a total of 72 special conditions setting out the requirements that the companies must satisfy. The Council’s monitoring during the year under review included 10 inspections and two deposition gauge surveys. The deposition gauge

TRC Annual Report 2021-2022

advocacy and investment management 72 Ngā whakataunga pūtea Financial statements 81 Te whākinga rawa i ngā ritenga pūtea tae noa ki te tau i mutu i te 30 o Pipiri 2022 Statement of comprehensive revenue and expense for the year ended 30 June 2022 82 Te whāriki i ngā tinihanga pūtea/rawa hoki tae noa ki te tau i mutu i te 30 o Pipiri 2022 Statement of changes in net assets/equity for the year ended 30 June 2022 83 Te whāriki i te āhuatanga pūtea tae noa ki te tau i mutu i te 30 o

NZEC deep well injection monitoring 2018-2019

Electrical conductivity mS/m 1,560 4,190 4,190 3,960 Chloride g/m3 1,520 69,200 13,800 11,400 Total petroleum hydrocarbons g/m3 11 4,600 42 57 Suspended Solids g/m3 3 360 3 45 Temperature 0C - - - 39.4 Table 4 Results of the Company’s monthly injectate sampling (2018-2019) Parameter Unit Minimum Maximum Average pH pH units 6.9 7.2 7.1 Conductivity mS/m 4,134 4,431 4,273 Suspended Solids g/m3 27 213 72 Salinity ppt 26.3 28.4 27.5 page 12 Parameter Unit

Annual report 2014-2015

pontoons at Waitara 71 Table 18 Summary of performance for Consent 5102-4 rock wall at Bell Block 72 Table 19 Summary of performance for Consent 4585-2 groyne at Waiwhakaiho 72 Table 20 Summary of performance for Consent 4603-2 foot bridge at Waiwhakaiho 73 Table 21 Summary of performance for Consent 7442-1 footbridge over the Waiwhakaiho 73 Table 22 Summary of performance for Consent 4523-1 seawall - Te Henui Stream 73 Table 23 Summary of performance for Consent 4586-2 boat

Cheal deep well injection monitoring 2020-2021

Max. injection volume (m3/day) Maximum injection rate (m3/hr) Max. injection pressure (bar) Avg. injection pressure (bar) 2020-2021 8,062 106 4.5 94.9 30 2019-2020 16,822 144 6.7 75.4 37 2018-2019 31,780 242 10.1 100.4 35 2017-2018 39,981 343 14.3 94.3 25 Deep well injection at Cheal-A via the Cheal-A7 injection well 2020-2021 8,139 68 6.6 103.6 72 2019-2020 14,115 107 5.2 91.8 71 2018-2019 3,271 90 4.1 82.0 20 page 18

Mangati Catchment Joint Monitoring Programme Annual Report 2021-2022

Table 32 Tegel stormwater and wetland sampling results, 21 March 2022 63 Table 33 Summary of performance for Tegel consent 3470-4 64 Table 34 Summary of performance for Tegel consent 7389-1 65 Table 35 Summary of performance for Tegel consent 4026-3 66 Table 36 Summary of performance for Tegel consent 5494-2 67 Table 37 TIL stormwater sampling results 71 Table 38 Summary of performance for TIL consent 7578-1 71 Table 39 Summary of performance for TIL consent 6952-1 72