Your search for '72' returned 971 results.

Compliance biomonitoring summary 2019-2020

sites) and Summer 2020 (142 sites) TRC Grading MCI Spring 2019 Summer 2020 No. DS sites % DS No. sites % sites No. DS sites % DS No. sites % sites Excellent ≥140 0 0 0 0 0 0 0 0 Very Good 120-139 8 62 13 12 3 33 9 6 Good 100-119 17 65 26 25 28 72 39 27 Fair 80-99 26 72 36 34 32 68 47 33 Poor 60-79 21 78 27 26 33 79 42 30 Very Poor <60 3 100 3 3 5 100 5 4 Compliance monitoring sites with ‘very poor’ or ‘poor’ health were typically either in …

Annual report 2012-2013

receiving waters. No odour issues were noted during the inspection. The following action was to be taken: • Check all drains and silt traps and clean out/repair if required. • Remove dead goats 2.1.1.2 12 October 2012 A site visit was made to conduct a compliance monitoring inspection and to take water samples. It was fine at the time of the inspection with 7.5 mm rain over the previous 72 hours. The Haehanga Stream was at moderate to low flow at the time of the inspection.

NPDC Colson Road Landfill Annual Report 2023-2024

performance for uncontaminated stormwater Consent 4620-1 68 Table 28 Summary of performance for discharge to land Consent 4621-1.1 69 Table 29 Summary of performance for composting air Consent 4622-1 70 Table 30 Summary of performance for air discharge Consent 4779-1.1 71 Table 31 Summary of performance for earthworks stormwater Consent 6177-2.0 72 Table 32 Summary of performance for earthworks stormwater Consent 10804-1.0 73 Table 33 Summary of performance for earthworks

Mangati Catchment Annual Report 2023-2024

5494-2 67 Table 43 Summary of performance for Abraham Consent 7147-2 69 Table 44 Mangati Stream sampling sites 71 Table 45 Sampling sites in associated tributaries of the Mangati Stream 71 Table 46 Mangati Stream wet weather sampling results, 17 November 2023 72 Table 47 Mangati Stream dry weather sampling results, 22 March 2024 72 page vi Table 48 Mangati Stream wet weather sampling results, 14 June 2024 73 Table 49 Dissolved copper concentrations (in

NPDC Mangapouri Cemetery Annual Report 2022-2023

6.3 6.5 6.3 6 6 6.5 Total alkalinity g/m3 CaCO3 170 158 171 72 72 180 Carbonate g/m3 CO3 < 1.0 < 1.0 < 1.0 < 1.0 < 1.0 < 1.0 Bicarbonate g/m3 HCO3 210 193 210 88 88 220 Total hardness g/m3 CaCO3 131 119 125 67 67 210 Electrical conductivity mS/m 42.7 44 41.7 20.2 20.2 49.5 Total suspended solids g/m3 < 3 < 3 8 4 < 3 90 Total dissolved solids g/m3 230 270 220 131 131 320 Dissolved aluminium g/m3 - - < 0.003 - < 0.003 0.004 Dissolved arsenic g/m3 - - < 0.0010 - < 0.0010 < 0.0010 Dissolved

Fonterra Kapuni Annual Report 2022-2023

Table 24 Location of water quality sampling sites 71 Table 25 Summary of Kaupokonui Stream water quality data (ranges) from monthly monitoring for the year under review (N=6 samples) 72 Table 26 Summary of Kaupokonui Stream water quality data from the Council surveys during the period August 1994 to June 2022 74 Table 27 Description of the groundwater monitoring sites 75 Table 28 Summary of selected parameters from previous Council groundwater quality sampling performed during the

August 2021 hydrology report

Waiwhakaiho Egmont Village 18 225.5 103 1697.0 111 72 Aug 1990 Manganui Everett Park 15 201.0 106 1388.0 105 68 Jan 1987 Oxi' Ponds Inglewood 16 185.5 87 1450.0 97 62 May 1999 TRC Stratford 16 249.0 127 1459.0 112 74 Jul 1998 Mangaehu Toko (Huinga) 15 167.0 109 1071.0 105 69 Jul 1998 Kotare Tongaporutu 17 184.0 98 1243.0 94 58 Jan 1998 Kaka Rd Okoki 17 238.5 121 1289.5 93 58 Aug 1990 Pohokura Saddle Pohokura 15 186.5 98 1207.0 97 61 Aug 1990 Stony Mangatete Rd 20 202.0 105

Pocket R19 Waitara Express May24

o n ly 8 a m -5 p m 0 8 0 0 B EE T R C [0 8 0 0 2 3 3 8 72 ] E m a il u s at : tr a n sp o rt @ tr c. g o vt .n z Yo u d o n ’t n e e d a B e e C a rd t o t a k e t h e b u s, b u t it is c h e a p e r w h e n y o u h a v e o n e . H o w t o u se t h e b u s B ee C a rd is

Ordinary Council Agenda February 2025

and Risk Committee Minutes 23 9. Council Conduct Complaint 27 10. Appointment of Councillor Littlewood to Standing Committees 59 11. 2025/2026 Annual Plan and Estimates Approach 63 12. Meeting Dates for March 2025 72 13. Public Excluded 14. Public Excluded Recommendations 73 15. Confirmation of Public Excluded Ordinary Minutes 74 16. Receipt of Public Excluded Executive Audit and Risk Committee Minutes 78 17. Closing Karakia 81 18. Agenda Authorisation 82 Ordinary