Your search for '72' returned 976 results.

Biennial report 2012-2014

NPDC NP wastewater treatment plant consent monitoring report - Taranaki Regional Council.

NPDC New Plymouth WWTP Annual Report 2021-2022

activities. During the monitoring period, NPDC demonstrated an overall high level of environmental performance and high level of administrative performance. In relation to the operation of the NPWWTP, NPDC held six resource consents, which included a total of 72 conditions setting out the requirements that NPDC must satisfy. NPDC holds one consent to discharge treated wastewater into the Tasman Sea, one consent to discharge sludge leachate to groundwater, two consents relating to structures,

Annual report 2014-2015

130 Table 70 Results of previous surveys performed in the Waingongoro River at SH45, together with spring 2014 and summer 2015 results 132 Table 71 Characteristic taxa (abundant, very abundant, extremely abundant) recorded in the Waingongoro River at SH45 between 1995 and February 2014 [39 surveys], and by the spring 2014 and summer 2015 surveys 133 Table 72 Results of previous surveys performed in the Waingongoro River at the Ohawe Beach site, together with spring 2014 and

Annual report 2014-2015

8.4 Recommendation 69 9. OMV New Zealand Ltd 70 9.1 Introduction 70 9.1.1 Process description 70 9.1.2 Water discharge permit 70 9.2 Results 71 9.2.1 Water 71 9.2.1.1 Inspections 71 page iv 9.2.1.2 Results of discharge monitoring 71 9.2.2 Investigations, interventions, and incidents 72 9.3 Discussion 72 9.3.1 Discussion of site performance 72 9.3.2 Environmental effects of exercise of consent 72 9.3.3 Evaluation of performance 72 9.3.4

Application Attachment Appendix C Hydrology Assessment Manawa Energy 14 Feb 2023

outflows 70 3.7 River flow regime downstream of Motukawa Scheme 72 3.7.1 Synthetic time-series flows for ungauged locations 72 3.7.2 Manganui River nodes 72 3.7.3 Waitara River nodes 79 3.8 Summary of flow statistics 81 4 Proposed Motukawa HEPS Operating Regime 82 4.1 Proposed changes 82 page Tonkin & Taylor Ltd Reconsenting of Motukawa Hydroelectric Power Scheme - Hydrology Report Trustpower Ltd November 2021 Job No: 1008726 Phase 100 4.2 Operational model of the Scheme 82

Annual report 2014-2015

8.3.1 Discussion of plant performance 68 8.3.2 Environmental effects of exercise of consent 69 8.3.3 Evaluation of performance 69 8.3.4 Recommendations from the 2013-2014 Annual Report 70 8.3.5 Alterations to monitoring programmes for 2015-2016 70 8.4 Recommendation 71 9. Taranaki Sawmills Limited 72 9.1 Introduction 72 9.1.1 Process description 72 9.1.2 Water discharge permit 77 page iv 9.1.3 Air discharge permit 77 9.2 Results 78 9.2.1 Inspections 78