Your search for '53 cumming street' returned 1580 results.

Optimisation of Farm Irrigation Part 1

Season (m 3 /ha/yr) 1 44 14 31 0.40 2,200 2 44 11 40 0.51 4,840 3 32 7 46 0.58 6,400 4 32 6 53 0.67 5,120 5 30 6 50 0.63 4,200 6 30 6 50 0.63 3,600 7 50 12 42 0.53 4,000 8 44 12 37 0.46 3,960 Irrigation Systems: Listed below is a summary of systems used in the region, along with benefits and constraints. K-lines; relatively low capital cost, low application rates, suits farm layout, high labour and maintenance requirements. Long lateral; low capital cost, suits existing farm layout,

Annual report 2014-2015

Hydrocarbons g/m3 <0.5 <0.5 <0.5 <0.5 Turbidity NTU 2.6 27 380 100 Suspended solids g/m3 <2 27 64 53 Zinc-dissolved g/m3 0.247 0.360 0.987 0.724 page 14 Figure 3 Zinc concentrations in the unnamed tributary of the Kahouri Stream immediately upstream of the Company’s industrial discharge since 1994 (site KHI000353). 2.1.2.2 Industrial discharge site (IND005014) Historical and current results from the industrial discharge from the yellow novaflow pipe

Annual report 2015-2016

programme associated with resource consents held by three concrete batching plants in the Taranaki Region, namely Allied Concrete Limited (Allied Concrete) on Mould Street in Waitara, Firth Industries on Glover Road in Hawera, and Fletcher Concrete and Infrastructure Limited (Fletcher Concrete) on Mountain Road in Stratford. This report covers the results and findings of the monitoring programme implemented by the Council in respect of the consents held by Allied Concrete, Firth Industries,

Agenda

high risk sites in heavily populated residential areas such as Rata Street in Inglewood is underway. A managed shut down period over Christmas for “the Summer Journeys” campaign was well received by drivers, who experienced free flowing networks for their holiday travel. Emergency Works Following June Severe Weather Event The Transport Agency is working through the geotechnical investigation and structural design phase for the 15 sites across the region on SH3, SH43 and SH45.

Motukawa hydro scheme monitoring 2019-2020

Summary of performance for Consent 5084-1 52 Table 18 Summary of performance for Consent 5085-1 52 Table 19 Summary of performance for Consent 5086-1 53 Table 20 Summary of performance for Consent 5087-1 54 Table 21 Summary of performance for Consent 5088-1 54 Table 22 Summary of performance for Consent 6388-1 55 Table 23 Summary of performance for Consent 6390-1 56 Table 24 Summary of performance for Consent 6391-1 57 Table 25 Summary of performance for Consent 6381-1 …