Season
(m
3
/ha/yr)
1 44 14 31 0.40 2,200
2 44 11 40 0.51 4,840
3 32 7 46 0.58 6,400
4 32 6 53 0.67 5,120
5 30 6 50 0.63 4,200
6 30 6 50 0.63 3,600
7 50 12 42 0.53 4,000
8 44 12 37 0.46 3,960
Irrigation Systems: Listed below is a summary of systems used in the region, along with
benefits and constraints.
K-lines; relatively low capital cost, low application rates, suits farm layout, high
labour and maintenance requirements.
Long lateral; low capital cost, suits existing farm layout,
Hydrocarbons g/m3 <0.5 <0.5 <0.5 <0.5
Turbidity NTU 2.6 27 380 100
Suspended solids g/m3 <2 27 64 53
Zinc-dissolved g/m3 0.247 0.360 0.987 0.724
page
14
Figure 3 Zinc concentrations in the unnamed tributary of the Kahouri Stream immediately upstream
of the Company’s industrial discharge since 1994 (site KHI000353).
2.1.2.2 Industrial discharge site (IND005014)
Historical and current results from the industrial discharge from the yellow novaflow
pipe
Policy & Planning Committee agenda June 2020
Westside deep well injection consent monitoring report 2017-2018
programme associated with resource consents held
by three concrete batching plants in the Taranaki Region, namely Allied Concrete
Limited (Allied Concrete) on Mould Street in Waitara, Firth Industries on Glover
Road in Hawera, and Fletcher Concrete and Infrastructure Limited (Fletcher Concrete)
on Mountain Road in Stratford.
This report covers the results and findings of the monitoring programme
implemented by the Council in respect of the consents held by Allied Concrete, Firth
Industries,
Review of regulation of deep well injection under the Resource Management Act (GNS Science, 2013).
high risk sites in heavily populated residential
areas such as Rata Street in Inglewood is underway. A managed shut down period over Christmas for
“the Summer Journeys” campaign was well received by drivers, who experienced free flowing networks
for their holiday travel.
Emergency Works Following June Severe Weather Event
The Transport Agency is working through the geotechnical investigation and structural design phase
for the 15 sites across the region on SH3, SH43 and SH45.
Summary of performance for Consent 5084-1 52
Table 18 Summary of performance for Consent 5085-1 52
Table 19 Summary of performance for Consent 5086-1 53
Table 20 Summary of performance for Consent 5087-1 54
Table 21 Summary of performance for Consent 5088-1 54
Table 22 Summary of performance for Consent 6388-1 55
Table 23 Summary of performance for Consent 6390-1 56
Table 24 Summary of performance for Consent 6391-1 57
Table 25 Summary of performance for Consent 6381-1 …