between 27 Apr 2020 and 21 May 2020
Doc# 2509563-v1
R2/0196-5.0 Commencement Date: 01 May 2020
Stratford District Council Expiry Date: 01 Jun 2034
Chief Executive, PO Box 320, Stratford 4352 Review Dates: Jun 2021, then annually
until 2025, and 3-yearly thereafter
Activity Class: Discretionary
Location: Stratford Wastewater Treatment
Plant, Victoria Road, Stratford
Application Purpose: Replace
To discharge …
operators in the dusty conditions. An odour-
neutralising agent is pumped into the air from a manifold around the door while it is open.
The store remains closed and inoperative for about 30% of days in the year. Filling takes place for about
50% of days in a year, and emptying for 20%.
Additional components are mixed into the chicken litter, at present on the ground outside the store with a
front-end loader (solids).
Wastewater from washing down the trucks (with quaternary ammonia
discharge of
wastewater to land
16. Require that the duration of
any consent for discharge
of wastewater recognise
and provide for future
of contaminated leachate and stormwater
into Haehanga stream. No direct disposal
of contaminated water should occur
directly to an awa.
This is not only a ‘perception’ issue – also
evidence of physical adverse effects on
Ngāti Mutunga values including ‘mahinga
kai species are
State of the Environment Report 2015
Taranaki Regional Council meeting agenda April 2020
building during galvanising operations. Large doors positioned
on the northern and eastern sides of the main building provide access for the receipt and dispatching of
materials at the site.
The area immediately surrounding the galvanising buildings is concreted. The concrete and metal yard
located on the northern side of plant is used as laydown area for materials waiting to be processed or
dispatched.
Effluent tanks collecting wastewater from the plant are housed within a concrete
receipt and dispatching of
materials at the site.
The area immediately surrounding the galvanising buildings is concreted. The concrete and metal yard
located on the northern side of plant is used as laydown area for materials waiting to be processed or
dispatched.
Effluent tanks collecting wastewater from the plant are housed within a concrete bunded area situated on
the south-eastern corner of the galvanizing plant (Figure 1).
Stormwater from the roofs of the galvanising plant is
concrete and metal yard located on the northern side of plant is used as laydown area
for materials waiting to be processed or dispatched.
Effluent tanks collecting wastewater from the plant are housed within a concrete
bunded area situated on the south-eastern corner of the galvanizing plant (Figure 1).
Stormwater from the roofs of the galvanising plant is collected for use on site.
page
5
The stormwater drain located on the north-eastern side of the site was
our rivers, flow and water level
changes and riparian habitat damage.”
The breadth of NIWA’s work on freshwater gives an indication
of the complexity and range of human impact.
For example, teams of scientists are working on ways to
treat human wastewater in towns and on farms, installing
fish passages in channelled waterways, reducing the flood of
rain channelled by urban and road stormwater, calculating
downstream impacts of water take, building wetlands and
riparian strips to stop
2007
June
2020 2026
Z Energy Ltd 1020-4
To discharge stormwater and treated
wastewater to the coastal marine area via the
Hongihongi Stream
April
2015
June
2020 2032
OMV Taranaki Ltd 5542-2
To discharge treated and untreated stormwater
from a petrochemical storage tank facility and
hydrostatic test water into the coastal marine
area via the Hongihongi Stream
Oct
2015
June
2020 2032
The operational boundaries of the consents monitored in the Hongihongi …