Your search for 'wastewater' returned 1065 results.

Lepper Piggery consent monitoring 2018-2019

Introduction 1 1.1.2 Structure of this report 1 1.1.3 The Resource Management Act 1991 and monitoring 1 1.1.4 Evaluation of environmental and administrative performance 2 1.2 Process description 3 1.3 Resource consents 5 1.4 Monitoring programme 6 1.4.1 Introduction 6 1.4.2 Programme liaison and management 6 1.4.3 Site inspections 6 1.4.4 Chemical sampling 6 2 Results 7 2.1 Water 7 2.1.1 Inspections 7 2.1.2 Wastewater trends over time 8 2.1.3 Results of

Taranaki By Products consent monitoring 2017-2018

in a water course, one consent to realign a water course, two consents to discharge emissions into air at the site, four consents to discharge to the Inaha Stream and a tributary, and two consents to discharge to land. During the monitoring period, Taranaki By-Products Ltd demonstrated an overall good level of environmental performance. Monitoring was carried out by both the Council and TBP. TBP monitors water abstraction rates, wastewater volumes and composition, effluent loading on

Annual report 2016-2017

consents to discharge to land. During the monitoring period, Taranaki By-Products Ltd demonstrated an overall good level of environmental performance. Monitoring was also carried out by both the Council and TBP. TBP monitors water abstraction rates, wastewater volumes and composition, effluent loading on irrigation areas, biofilter performance and weather conditions. The Council undertakes inspections of the plant site, irrigation and burial areas; water quality and biological monitoring

Annual report 2016-2017

Inspections 9 2.1.2 Wastewater trends over time 10 2.1.3 Results of discharge and receiving waters physicochemical monitoring 13 2.1.4 Treated effluent discharge records 19 2.2 Air 22 2.2.1 Inspections 22 2.3 Investigations, interventions, and incidents 23 3 Discussion 24 3.1 Discussion of site performance 24 3.2 Environmental effects of exercise of consents 25 3.3 Evaluation of performance 26 3.4 Recommendations from the 2015-2016 Annual Report 29 3.5 Alterations to

Annual report 2014-2015

Process description 4 1.3 Resource consents 5 1.3.1 Water abstraction permit 5 1.3.2 Water discharge permit 6 1.3.3 Air discharge pemit 7 1.4 Monitoring programme 8 1.4.1 Introduction 8 1.4.2 Programme liaison and management 8 1.4.3 Site inspections 8 1.4.4 Chemical sampling 8 2. Results 10 2.1 Water 10 2.1.1 Inspections 10 2.1.2 Results of discharge and receiving waters phyicochemical monitoring 11 2.2 Historical wastewater trends 17 2.2.1 Evaluation of treatment

Annual report 2013-2014

Company’s activities. The Company holds a total of two resource consents, which include a total of 13 conditions setting out the requirements that the Company must satisfy. The Company holds resource consent 5108-2 to allow it to discharge treated effluent into the Tawhiti Stream, and consent 5266-1 to discharge emissions into the air at this site. The Council’s monitoring programme for the year under review included four inspections including two wastewater and receiving water samples

NP Waste Water Treatment Plant consent monitoring 2017-2018

page New Plymouth District Council New Plymouth Wastewater Treatment Plant Marine Outfall and Sludge Lagoon Monitoring Programme Annual Report 2017-2018 Technical Report 2018-62 This report was initially issued by the Council with an incorrect marine ecological report attached as Appendix IV. This has been corrected as of October 2019 Taranaki Regional Council

McKee Power Plant monitoring 2020-2021

Company during the period under review. Table 1 Resource consents held for MPP Consent number Purpose Granted Review Expires Water abstraction permit 2393-3 To take water from the Mangaone Stream for use in a gas fired Power Station. Feb 2016 June 2024 June 2033 Water discharge permits 4560-2 To discharge wastewater from filter backwashing and tank cleaning into the Waitara River. Jan 2003 - June 2021 7920-1 To discharge wastewater and

Annual report 2015-2016

Process description 4 1.3 Resource consents 5 Water abstraction permit 5 1.3.1 Water discharge permit 6 1.3.2 Air discharge pemit 7 1.3.3 1.4 Monitoring programme 8 Introduction 8 1.4.1 Programme liaison and management 8 1.4.2 Site inspections 9 1.4.3 Chemical sampling 9 1.4.4 2. Results 10 2.1 Water 10 Inspections 10 2.1.1 Results of discharge and receiving waters phyicochemical 2.1.2 monitoring 11 2.2 Historical wastewater trends 16 Evaluation of treatment pond

Annual report 2014-2015

page South Taranaki District Council Waverley, Kaponga, Manaia and Patea Municipal Wastewater Treatment Plant Systems Monitoring Programmes Annual Report 2014-2015 Technical Report 2015-09 Taranaki Regional Council ISSN: 1178-1467 (Online) Private Bag 713 Document: 1541036 (Word) STRATFORD Document: 1547289 (Pdf) September 2015 page page Executive summary The