Your search for 'plan' returned 2976 results.

RKM Piggery Annual Report 2022-2023

Compliance achieved? 1. Provision of wastewater plan Plan received by Council Nov 2010 Yes page 11 Purpose: To discharge treated piggery effluent from an oxidation ponds system followed by tertiary treatment into water Condition requirement Means of monitoring during period under review Compliance achieved? 2. Adoption of best practical option to avoid or minimise adverse effects Liaison with Company and inspection Yes 3. Maximum allowable number of

Value Timber Supplies Ltd Woodwaste Disposal Annual Report 2022-2023

water, this is also equivalent to parts per million (ppm), but the same does not apply to gaseous mixtures Incident register A register containing a list of events recorded by the Council on the basis that they may have the potential or actual environmental consequences that may represent a breach of a consent or provision in a Regional Plan Incident An event that is alleged or is found to have occurred that may have actual or potential environmental consequences or may involve

Tarnaki Enviroschools Calendar of events Terms 1 and 2 2024

annotation https://www.beyondcop21symposium.org/ https://www.beyondcop21symposium.org/ page A full resource to unpack the Sustainable Development Goals is here annotation https://drive.google.com/file/d/1KWrky3LBnZrcxGA-hYFxp7jTgziP9g_N/view?usp=sharing https://drive.google.com/file/d/1KWrky3LBnZrcxGA-hYFxp7jTgziP9g_N/view?usp=sharing page We want your thoughts and ideas - Taranaki Regional Council plans Our team can run through this with your akonga or you can unpack it

OMV New Zealand Ltd Maui Production Station Annual Report 2022-2023

during planned maintenance activities, and emergency situations. A change to plant management has seen this reduced to one flare. The flare continuously burns fuel gas as a purge to prevent air ingress to the flare system (thus avoiding an explosion risk) and to maintain a pilot flame at the flare tip. 1 The Council has used these compliance grading criteria for more than 19 years. They align closely with the 4 compliance grades in the

SH3 Working Party Booklet 2024

Telecom site on Taumatamaire Road went live in March 2013, improving coverage along the Awakino Gorge. Telecom currently have no plans to expand coverage at Mount Messenger, with the challenging topography and lack of existing infrastructure making it difficult to form a business case to do so. Access to the Maui gas pipeline The Maui gas pipeline, which runs from the Maui production station at Oaonui in Taranaki to the Huntly Power Station in Waikato, feeds gas to much of

Tamarind NZ Onshore Ltd Sidewinder Production Station Annual Report 2022-2023

the Sidewinder wellsite into the Piakau Stream Condition requirement Means of monitoring during period under review Compliance achieved? 1. Adoption of the best practicable option Inspection and liaison with consent holder Yes 2. Maximum stormwater catchment area Inspection and company records Yes 3. Notification to Council seven days prior to site works and well drilling No site works during monitoring period N/A 4. Maintenance of a contingency plan Latest update

2021/2022 TST Annual Report

Plymouth District Council and the Taranaki Regional Council have agreed upon a long-term maintenance and development programme for the ten years from 2015/2016 to 30 June 2025. The Taranaki Regional Council provided the annual funding of $2,178,669 to the Taranaki Stadium Trust. Asset management planning for Yarrow Stadium is on hold while the repair and refurbishment project is delivered. Funding has been used to deliver the repair and refurbishment project. The focus has been

Appendix L - Environmental & Safety Management Plan

page Health Safety Environment Interface Uruti Environmental Management Plan P-751-020-D Uruti Remediation Site Page 1 of 17 Rev E – 13/11/2019 HEALTH SAFETY ENVIRONMENT INTERFACE DOCUMENT ENVIRONMENTAL MANAGEMENT PLAN Uruti Remediation Site August 2014 Rev E – ISSUE FOR USE 13/11/2019 page Health Safety Environment Interface Uruti Environmental Management Plan P-751-020-D Uruti Remediation

Appendix H - Uruti composting facility management plan

page REPORT Uruti Composting Facility Management Plan page Uruti Composting Facility Management Plan Remediation New Zealand Reviewed Report Author Greg Larkin, Environmental Scientist , BSc Ecology and MSc in Environmental Science Date Reviewed by Dave Bolger, Senior Environmental Advisor, BSc Physical Geography and

Appendix F - Leachate & stormwater management plan

page URUTI COMPOSTING & VERMICULTURE FACILITY Leachate & Stormwater Management Plan Document No:RU-650-0500-A Revision No:1.5 Date: 5 June 2020 page Leachate & Stormwater Management Plan URUTI - REMEDIATION NZ LTD Page 1 Document No: RU-P-650-0500-A Revision No: V1.5