Your search for 'Appendix II' returned 2021 results.

NPS Periphyton Monitoring Report 2018-2021

Appendix I Periphyton Flow Sampling Dates page ii List of tables Table 1 Periphyton attribute table (NPS-FM, 2020) 2 Table 2 Periphyton guidelines in New Zealand 3 Table 3 Sites monitored in the monthly periphyton monitoring programme 4 Table 4 Physicochemical monitoring undertaken as a component of the monthly periphyton monitoring programme 6 Table 5 River Environment Classification (REC) classes and categories within each class. Classes

Annual report 2016-2017

16 3 Discussion 18 3.1 Discussion of site performance 18 3.2 Evaluation of performance 19 3.3 Recommendations from the 2015-2016 Annual Report 21 3.4 Alterations to monitoring programmes for 2017-2018 22 4 Recommendations 23 page ii Glossary of common terms and abbreviations 24 Bibliography and references 25 Appendix I Example surface water abstraction permit for irrigation Appendix II Active irrigation consents in Taranaki July 2016 to June 2017

Regional Cleanfill Annual Report 2020-2021

Bibliography and references 77 Appendix I Resource consents held by cleanfill owners and operators (alphabetical order) Appendix II TPJ Partnership’s land management plan List of tables Table 1 Cleanfill related consents monitored under this programme during the period under review 6 Table 2 Number of samples collected and inspections conducted at each site 10 Table 3 Summary of performance for AA Contracting Ltd piping consent 5179-2 13 Table 4 Summary of performance for

Annual report 2012-2013

3.4 Environmental effects of groundwater movement 26 3.5 Evaluation of performance 26 3.6 Recommendations from the 2011-2012 Annual Report 28 3.7 Alterations to monitoring programmes for 2013-2014 28 3.8 Exercise of optional review of consent 29 4. Recommendations 30 Glossary of common terms and abbreviations 31 Bibliography and references 33 Appendix I Resource consents held by Dow AgroSciences (NZ) Ltd 35 Appendix II List of 255 pesticide residues analysed

Ballance Kapuni consent monitoring 2020-2021

Agri-Nutrients (Kapuni) Ltd Appendix II Review of Stark Environmental Reports: Kapuni macroinvertebrate biomonitoring and electric fishing in relation to Ballance Agri-Nutrients Kapuni Ltd and Vector Ltd – July 2020 – June 2021 Appendix III Technical review report prepared by Ballance Agri-Nutrients under special condition 10 of air discharge permit 4046-3 List of tables Table 1 Discharges and emissions from the ammonia urea plant 5 Table 2 Resource consents for operation of

Lake Rotorangi monitoring report 2018-2019

page ii Appendix I Flow data for the Patea River at Skinner Road, the Mangaehu River at Raupuha Road bridge, and the synthesised inflow into Lake Rotorangi for the period 1 July 2018 to 30 June 2019 Appendix II TRC Lake Rotorangi water quality trend analysis 1990-2018 List of tables Table 1 Water quality parameters measured at the two sampling sites 5 Table 2 Sampling dates for the Lake Rotorangi water quality monitoring programme 7 Table 3 Observations at

Wellington landfarm consent monitoring 2018-2019

monitoring programmes for 2019-2020 25 4 Recommendations 26 Glossary of common terms and abbreviations 27 page ii Bibliography and references 29 Appendix I Resource consents held by BTW Company Ltd Appendix II Company provided annual report List of tables Table 1 Resource consent held by Company 8 Table 2 Chemical analytes by medium 10 Table 3 Wellington landfarm application dates and waste origins 11 Table 4 Soil sample analysis Wellington