Your search for ' plant order forms' returned 3044 results.

Wellington landfarm consent monitoring 2018-2019

esters as a base material. While this is technically still a form of oil based fluid, these fluids have been engineered to remove polycyclic aromatic hydrocarbons, reduce the potential for bioaccumulation and accelerate biodegradation compared with OBM. Common constituents of WBM and SBM include weighting agents, viscosifiers, thinners, lost circulation materials (LCM), pH control additives, dispersants, corrosion inhibitors, bactericides, filtrate reducers, flocculants and lubricants. Of

Resource consents issued from 6 July to 16 August 2018

manufacture and processing of milk products and associated processes Change of consent conditions to include emissions from:  the drying of whey protein concentrate at Powder-3; and  a new dissolved air floatation treatment plant annotation http://irisprod.trc.govt.nz/IRISObjectRouter.aspx?IRISObjectID=748717 http://irisprod.trc.govt.nz/IRISObjectRouter.aspx?IRISObjectID=748717 annotation http://irisprod.trc.govt.nz/IRISObjectRouter.aspx?IRISObjectID=748719

Consents issued 18 August-5 October 2017

Waitotara meat processing plant R2/1215-3.0 Commencement Date: 20 Sep 2017 Double D Trust Partnership Expiry Date: 01 Dec 2029 83 Lower Winks Road, RD 28, Hawera 4678 Review Dates: 01/06/2019, 01/06/2021, 01/06/2023, 01/06/2025, 01/06/2027 Activity Class: Controlled Location: 1700 Upper Palmer Road, Mahoe Application Purpose: Replace To discharge farm dairy effluent: • onto land and, after treatment in an oxidation pond system, into an unnamed

Minutes

corridor, particularly via rail. Milk is conveyed from the processing facilities at Oringi and Longburn to the Whareroa plant in Hawera (though this is likely to decline with the expected upgrade of Fonterra’s Pahiatua site with a new milk powder dryer in 2015). There is also a large West-East counter flow from Taranaki, particularly export goods to other North Island ports, with strong volumes through Port of Napier.” Expand on details of the Urban Cycleways Fund outlined in Section 6.1

Annual report 2016-2017

wellsite were undertaken by a Council Officer for sampling purposes, as outlined in Section 1.4.4. 1.4.4. Injectate sampling Injectate samples were obtained for analysis in the Council’s IANZ accredited laboratory on two occasions during the monitoring period. The sampling of injectate is carried out in order to characterise the general chemical nature of the discharge and also the variation in its chemical composition across the monitoring period. Injectate samples were collected from

Consents issued 10 November 2017-18 January 2018

R2/3769-4.0 Commencement Date: 01 Dec 2017 South Taranaki District Council Expiry Date: 01 Jun 2034 Chief Executive, Private Bag 902, Hawera 4640 Review Dates: June annually Activity Class: Discretionary Location: Nukumaru Parade, Waiinu Beach Application Purpose: Replace To discharge treated domestic wastewater from the Waiinu Beach Waste Water Treatment Plant to land R2/10484-1.0 Commencement Date: 05 Dec 2017 PKW Farms LP Expiry Date: 01 Jun 2035

Westown Haulage monitoring 2019-2020

solubilised under extreme environmental conditions. The abbreviation may alternatively be followed by the letter 'D', denoting the amount of the metal present in dissolved form rather than in particulate or solid form. For further information on analytical methods, contact a Science Services Manager. page 16 Bibliography and references Ministry for the Environment. 2018. Best Practice Guidelines for Compliance, Monitoring and Enforcement under the Resource …

Annual report 2014-2015

provision in a Regional Plan. Zn* Zinc. page 14 *an abbreviation for a metal or other analyte may be followed by the letters 'As', to denote the amount of metal recoverable in acidic conditions. This is taken as indicating the total amount of metal that might be solubilised under extreme environmental conditions. The abbreviation may alternatively be followed by the letter 'D', denoting the amount of the metal present in dissolved form rather than in particulate or solid

RLTPVariation NukumaruRail

existing crossing, a do-nothing LCSS will be produced in order to confirm whether the proposed changes would raise or lower the crossing safety level when compared to the exiting scenario. This will include an updated ALCAM ‘proposal’ that factors in the current AADT volumes of all applicable users. High (50-60) •The most dangerous level crossing situation, posing a real risk of death or serious injury occurring to users crossing the railway line. Level crossings which fall under this

Consents issued 24 Jan-5 Mar 2020

2025, Jun 2031, Jun 2037, Jun 2043, Jun 2049 Activity Class: Discretionary Location: Hawera Wastewater Treatment Plant, 24 Beach Road, Hawera Application Purpose: New To discharge emissions into the air from desludging and dewatering related activities at the Hawera Wastewater Treatment Plant Rohe: Ngati Ruanui annotation https://irisprod.trc.govt.nz/IRISObjectRouter.aspx?IRISObjectID=789056 …