Your search for 'regional explorer' returned 4424 results.

McKee Mangahewa PS consent monitoring 2018-2019

page Todd Energy Ltd McKee Mangahewa Production Station Monitoring Programme Annual Report 2018-2019 Technical Report 2019-39 Taranaki Regional Council ISSN: 1178-1467 (Online) Private Bag 713 Document: 2308814 (Word) STRATFORD Document: 2384709 (Pdf) March 2020 page page Executive summary Todd Energy Ltd (Todd

Report 2013

page Greymouth Petroleum Limited Kowhai-B Exploration Wellsite Monitoring Programme Report Technical Report 2013–82 ISSN: 0114-8184 (Print) Taranaki Regional Council ISSN: 1178-1467 (Online) Private Bag 713 Document: 1231055 (Word) STRATFORD Document: 1297176 (Pdf) February 2014 page page Executive summary Greymouth Petroleum Limited established a

Resource consents 28 September-8 November 2018

Midhirst (Property owner: Airport Farm Trustee Limited ) Application Purpose: Change To discharge treated stormwater from hydrocarbon exploration and production operations at the Radnor-B wellsite through a roadside drain into an unnamed tributary of the Piakau Stream Change of consent conditions to remove the limit on the stormwater catchment area page Non-notified authorisations issued by the Taranaki Regional Council between 28 Sep 2018 and 08 Nov 2018

MR2013 TaranakiVenturesCopperMoki1Wellsite

February 2011-May 2012 by the Taranaki Regional Council on the monitoring programme associated with resource consents held by Taranaki Ventures Limited in relation to exploration activities at the Copper Moki site. Taranaki Ventures Limited operates a wellsite situated on Cheal Road at Ngaere, in the Patea River catchment. Resource consents were transferred from Green Gate Limited to Taranaki Ventures Limited on 1 April 2011. This report covers the results and findings of the monitoring

Annual report 2013-2014

page Origin Energy Resources NZ Limited Rimu Production Station Monitoring Programme Annual Report 2013-2014 Technical Report 2014-40 ISSN: 0144-8184 (Print) Taranaki Regional Council ISSN: 1178-1467 (Online) Private Bag 713 Document: 1380321 (Word) STRATFORD Document: 1448363 (Pdf) February 2015 page page Executive summary Origin Energy Resources NZ Limited

Report 2015-2016

page Todd Energy Limited Te Kiri North-A Wellsite Monitoring Programme Report 2015-2016 Technical Report 2017-20 Taranaki Regional Council ISSN: 1178-1467 (Online) Private Bag 713 Document: 1849533 (Word) STRATFORD Document: 1862327 (Pdf) June 2017 page page Executive summary In 2015, Todd Energy Limited (the Company) established a hydrocarbon exploration

Report 2011-2013

page Greymouth Petroleum Limited Ngatoro-G Exploration Wellsite Monitoring Programme Report 2011-2013 Technical Report 2013–35 ISSN: 0114-8184 (Print) Taranaki Regional Council ISSN: 1178-1467 (Online) Private Bag 713 Document: 1301898 (Word) STRATFORD Document: 1329083 (Pdf) May 2014 page page Executive summary Greymouth Petroleum Limited established a

Cheal deep well injection monitoring 2019-2020

page Cheal Petroleum Ltd Deep Well Injection Monitoring Programme Annual Report 2019-2020 Technical Report 2020-26 Taranaki Regional Council ISSN: 1178-1467 (Online) Private Bag 713 Document: 2481772 (Word) STRATFORD Document: 2580020 (Pdf) October 2020 page page Executive summary Cheal Petroleum Ltd (the Company) …

How Taranaki Maunga inspired the new East Stand’s design

The iconic view of Taranaki Maunga reflected in the Pouākai Tarns and the flow of rivers from the mountain to the sea have provided the inspiration for the design narrative of the new East Stand at Stadium Taranaki. This design has been led by Ngāti Te Whiti, providing an identify for the stand which has been rebuilt as part of Taranaki Regional Council's redevelopment project to create the best regional stadium in Aotearoa/New Zealand. Kerehama Waru Te Pū worked on the narrative for five

Todd deep well injection monitoring 2018-2019

regarding hydrocarbon exploration and production in Taranaki, the DWI process and its history within region can be found in previous compliance reports published by the Council (see Bibliography). 1.3 Resource consents The Company holds six resource consents the details of which are summarised in the table below. One consent was varied during the reporting period. Consent 1315-1.2 was amended to extend the injection timeframe by a further 12 months and to change the consent purpose, to allow