Your search for 'rain fall' returned 1983 results.

STDC Coastal Structure Annual Report 2022-2023

9). This issue was raised with STDC at the time of the inspection and they arranged for a contractor to remove the builders to eliminate the risk of them falling onto the beach. During the 2023 inspection, the erosion at the northern end had worsened from previous monitoring period, posing an imminent risk to the dwelling located there. STDC also carried out inspections of this structure during the year under review. Their report was provided to Council on 30 June 2023. Recommendations

Council meeting (LTP submissions) agenda May 2018

(Chairman) M J Cloke M G Davey M P Joyce D L Lean (Deputy Chairman) C L Littlewood M J McDonald D H McIntyre B K Raine N W Walker C S Williamson Apologies Councillor D H McIntyre Notification of Late Items Item Page Subject Item 1 3 Hearing of Submissions on the Consultation Document for the 2018/2028 Long-Term Plan  List of Submitters who wish to be heard  Submissions received on the 2018/2028 Long-Term Plan  Submissions 1-19  Submissions

Annual report 2014-2015

Freshwater physicochemical state of the environment monitoring report - Taranaki Regional Council.

Kintyre Bush; Raurimu

regenerating well. Drains running North to south on both the eastern and western boundaries will also be altering the hydrology of the site. Herbivores - Medium Stock are excluded from the site through drains and a two wire fence around the perimeter. Stock incursions are infrequent. Possum Self-help This site falls within the Opunake possum self-help operation. Leg- hold trapping is carried out annually by a contractor. Predators - Medium Predators including rodents, mustelids, possums,

Hearing evidence - additional from Submitters - Van Kekem - 04 March 2022

OU is the appropriate guideline for a ‘moderately’ sensitive receiving environment. I consider that the Mr McDonald’s workshop/business would fall within this moderate sensitivity category. As such the 5 OU criteria within the MfE GPG Odour would be applicable to this receptor location. 1.15 I also wish to point out that the 2 OU contour in Figure 3 (proposed farm) extends well into the Area Q land on the other side of Airport Drive. It is my understanding

Annual report 2013-2014

rule in a regional plan, or by national regulations. Methanex currently holds a consent for a flood control structure in the Waitara River. Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Methanex currently holds two abstraction consents for the Waitara River. page

STDC Hawera Municipal Oxidation Ponds Annual Report 2022-2023

had experienced a natural rock fall event and was buried by large boulders and other debris, which caused the decline in richness and diversity observed in the previous monitoring period. However, the 2023 data shows that this site experienced an increase in these parameters from the previous year, which suggests the local intertidal community is beginning to recover. Overall, these results indicate that the marine outfall discharge was not having detectable adverse effects on nearby

Proposed Coastal Plan Environment Court Consent Order 17 May 2021

5 (6) all parties are satisfied that all matters proposed for the Court's endorsement are within the scope of relief sought in the appellants' notices of appeal, fall within the Court's jurisdiction, and conform to the relevant requirements and objectives of the Act including, in particular, Part 2. [12] Therefore the Court orders, by consent, that the Proposed Taranaki Coastal Plan is amended in accordance with Appendix A. The appeal points in relation to these

Value Timber monitoring report 2017-2018

well-maintained with approximately ten small stockpiles of sawdust waiting to be spread. The area was intact, with no cracking or slumping evident on either the fill area or the tip face. No unauthorised material was noted. There was no ponding observed, despite heavy rain the previous day, and the material was damp underfoot. The pre-fill gully was well grassed with no sign of exposed soil or sediment runoff. The stage 1 fill area was damp underfoot and had been recently grazed, and showed no sign of

Annual report 2015-2016

minor amount of erosion at one point that was likely to have been caused by the heavy rain in the previous week. The stormwater ponds were all nearly full, with approximately 0.3-0.5 m of freeboard. The contents were a relatively clear brown colour, and the lowest pond had an iron oxide sheen present on the surface. The downstream stormwater drain had recently been cleared of vegetation and there were no obstructions to flow. Silt controls were in place, and appeared to be effective as the