page
STRATFORD
WAITARA
Provisional data only
PATEA
NEW PLYMOUTH
OPUNAKE
ELTHAM
MANAIA
HAWERA
EGMONT
NATIONAL
PARK
Total monthly rainfall (mm)
KEY
xxx yy%
INGLEWOOD
Pohokura
Saddle
Dawson Falls
Cape Egmont
Stratford
Whareroa
Patea
North Egmont
Inglewood
Motunui
Brooklands
Kaka Rd
Kotare
Rimunui
Glenn Rd
Huinga
47%
36%
37%
23%
15%
18%11%
28%
15%
21%
22%
30%
33
68
52
NPDC coastal structures consent monitoring report 2018-2019
into the process sewers which flow to the
storm pond. The stormwater falling on the non-process areas of the western half of the site (Figure 1) is
directed by “v” ditches running alongside the roads to a dam/pond and then out to the Tasman Sea via the
Manu Stream. Stormwater falling on the eastern side of the site is directed to unnamed tributaries of the
Waihi Stream via outfalls and a small sedimentation pond.
Sludge from the storm pond, off-spec pond and blow down pond stored in lagoons
extended-duration
nuisance blooms reflecting high nutrient
enrichment and/or significant alteration
of the natural flow regime or habitat.
* The productive class is defined by River Environment Classification (REC) types, with a combination of dry climate categories
and soft-sedimentary, volcanic acidic and volcanic basic geology. All sites that do not fall in these categories are in the default
class.
1.3 Periphyton
Periphyton is the ‘slime’ and algae found on the beds of lakes and rivers. This
Regional Transport Committee Agenda June 2024
page
06/22- #650412 Page 5 of 8
4.4 State the relevant regional plan[s] and rule[s] numbers this application falls under.
Regional Fresh Water Plan Rule Number[s] ___________________________________
Regional Air Quality Plan Rule Number[s] ___________________________________
Regional Coastal Plan Rule Number[s] ___________________________________
Regional Soil Plan Rule Number[s] ___________________________________
No Specific Rule [eg,
1.3.1 Water abstraction permit
Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is
expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular
categories set out in Section 14.
GPL holds water abstraction permit 5384-2 to take groundwater from the Matemateaonga Formation for
use in enhanced hydrocarbon recovery activities at the Kaimiro-O wellsite. This permit was first issued by the
Taranaki Regional Council Annual Plan 2017/2018.
Draft Annual Plan 2017/2018.