Your search for 'rain fall' returned 1978 results.

Form No 520 Certificate of Compliance

page 07/23- #650412 Page 5 of 8 4.4 State the relevant regional plan[s] and rule[s] numbers this application falls under. Regional Fresh Water Plan  Rule Number[s] ___________________________________ Regional Air Quality Plan  Rule Number[s] ___________________________________ Regional Coastal Plan  Rule Number[s] ___________________________________ Regional Soil Plan  Rule Number[s] ___________________________________ No Specific Rule  [eg,

TPJ Partnership Cleanfill Annual Report 2023-2024

the signed resource consent please contact the TRC Consents department) page Water abstraction permits Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits authorising the abstraction of water are issued by the Council under Section 87(d) of the RMA. Water

Annual report 2015-2016

in the 2015-2016 monitoring period, as none was scheduled within the baseline monitoring programme. Because of the reduction of treated piggery effluent discharge periods including the reduction of pig numbers, a biomonitoring survey was not considered necessary on this occasion. page 10 Results 2. Water 2.1 Inspections 2.1.1 6 August 2015 The first inspection for the monitoring period was carried out after a period of heavy rain throughout the

Late item

Users: 5223 Tourism Sites: 1 State Highway: 10km Omamari Maunganui Bluff TECT Park (Adrenalin Forest) Utakura: Twin Coast Cycle Trail. Maruia Falls Buller Gorge Lake Rotoroa Cape Palliser Kenepuru Head Cable Bay Okiwi Bay Entrances/exits to Heaphy Track Totaranui Beach and campsite Pongaroa Wharariki Beach Cape Farewell Blackhead Kairakau Beach Waipatiki Beach Strathmore Tutira Raurimu Waihua Tongaporutu Entrances/exits to The Timber Trail

Schedule of charges Annual Plan 2023 2024

hydrometric equipment $680.90 per year Tawhiti hydrometric equipment (lower) $1,730.30 per year Tawhiti hydrometric equipment (upper) $1,070.30 per year Waingongoro hydrometric equipment $830.50 per year Waitaha hydrometric equipment $8,091.60 per year Rain Gauge Calibration $336.60 per deployment Chlorine Meter $20.80 per use Drone $132.00 per day Multi-parameter Field Meter $112.20 per day Haehanga hydrometric equipment $2,383.20 per year EXPLANATION This scale of charges is used to

Todd Energy Aquatic Centre Annual Report 2023 2024

consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits authorising the abstraction of water are issued by the Council under Section 87(d) of the RMA. Water discharge permits Section 15(1)(a) of the RMA stipulates that no person may discharge any contaminant into water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or by national regulations. Permits authorising discharges to water

Irrigation Water Monitoring Programme Annual Report 2021-2022

irrigation in Taranaki does take place within Zones 2, 3, 4 and 5, which represents a 10 km wide belt of coastal land stretching from Oakura to Waitotara. 1.1.7 Irrigation systems In general there are two types of irrigation methods; surface and pressurised. The majority of irrigation systems currently in operation in the region fall in to the pressurised category. Pressurised systems can be further differentiated based on the method of operation and equipment used. A summary of the systems