by the Resource Management Act
1991 (RMA). However, constraining attention
only to resource management issues which fall
within the CMA fails to recognise the
integrated nature of the wider coastal
environment. For this reason, it is proposed to
extend the coverage of the reviewed Coastal
Plan to include the wider coastal environment.
While values inland of the CMA can be
recognised through the Coastal Plan, rules will
only apply within the CMA area where the
Council has
by the Resource Management Act
1991 (RMA). However, constraining attention
only to resource management issues which fall
within the CMA fails to recognise the
integrated nature of the wider coastal
environment. For this reason, it is proposed to
extend the coverage of the reviewed Coastal
Plan to include the wider coastal environment.
While values inland of the CMA can be
recognised through the Coastal Plan, rules will
only apply within the CMA area where the
Council has
reflect that rainfall at the coast is richer in chloride and
sodium, compared to rainfall that falls inland. Nearly two thirds of GQMP sites plot
below the SWDL, suggesting that much of the region’s groundwater is enriched with
sodium from rock/water interactions with sodium rich source rocks.
26. An analysis of nitrate concentrations over the entire GQMP network suggests that there
has been little change in groundwater nitrate levels over the last five years. There is
weak statistical
“customer site” for
a. A minimum of 3 weeks, before spreading (no turning
required).
page
Remediation (NZ) Ltd RW-P-751-001-B
Organic Production Protocols Greenwaste Composting & Vermiculture
- 8 -
b. A cover should be applied to reduce excess moisture
retention from rain events.
c. The Revital contract spreader will ensure that before the
product is spread it has met 2(a) above, and the spreading
records will be filed as part of the
growth of multiple species and approaching acute
impact level for sensitive species at higher concentrations).
The national bottom line sits between bands B and C.
For nitrate, all 15 sites monitored in Taranaki achieved
national bottom lines, with all but three falling in band A
for both the annual median and 95th percentile measures.
The sites in band B were in mid and lower parts of southern
ring plain catchments, which are areas of more intensive
pastoral
When compared to criteria set out in the National Objectives
Framework (NOF), Lake Rotorangi falls within band B for
TLI Score Description Classification
0 - 2
Microtrophic: The lake is very clean with very low levels of nutrients and algae. The
lake can have snow or glacial sources.
Very good
>2 - 3 Oligotrophic: The lake is clear and blue, with low levels of nutrients and algae Good
>3 - 4 Mesotrophic: The lake has moderate levels of nutrients and algae. Fair
>4 - 5
2 Results
2.1 Inspections
30 July 2019
An inspection was undertaken under consent 5838-2.2 (this is the discharge to land consent) as part of
routine compliance monitoring. The inspection was carried out in fine weather conditions following rain
within the previous 24 hours. The surface water bodies across the site were elevated, swift and turbid.
An inspection of the site found that the irrigation areas were wet with standing water observed on the
uppermost irrigation area. …
stock. There were issues around keeping buried
product in the ground due to elevated groundwater levels, the officer noted that the pits appeared to be
well managed. At the time of the inspection a discharge pipe to pond 1 had been damaged and product is
leaking into the ground. TBP was advised that this needed to be resolved before the next inspection.
4 May 2022
At the time of the inspection, the inspecting officer was advised that heavy rain had contributed to high
groundwater levels
A cover should be applied to reduce excess moisture
retention from rain events.
c. The Revital contract spreader will ensure that before the
product is spread it has met 2(a) above, and the spreading
records will be filed as part of the completed order;
i. If Revital are not spreading a particular order, then
the Grower or Contract Spreader to advise RNZ when
this is to be done and gain clearance before spreading
proceeds. This will be noted on the completed order.