Your search for 'rain fall' returned 1990 results.

Stanley Bros Trust Piggery Annual Report 2021/22

applied (mm) m3 of effluent Total 105.1 - 24,083 2.3.2.3 Method of irrigation The effluent from the piggery is pumped to storage pond prior to land application. The Company communicated that three different delivery systems were used during the 2021-2022 monitoring year: 1. Dribble bar – main method of effluent application, depths applied (~3 mm) 2. ‘Weta’ travelling rain gun – used to apply effluent to the Sand Dune block at 8mm depths during 8 months of the year. 3. Slurry tank

NPDC Colson Road Landfill Annual Report 2022-2023

by NPDC that relate to the Colson Road landfill 14 Table 2 Monitoring programme objectives and programme development methodology 15 Table 3 Summary of monitoring activity for 2022-2023 16 page iii Table 4 Chemical analysis of Colson Road landfill combined site leachate discharge 33 Table 5 Results of analysis of under liner drainage for the year under review. 35 Table 6 Results of rain event monitoring – discharge and Puremu Stream samples, 1 June 2023 40

Agenda

McIntyre B K Raine N W Walker C S Williamson Apologies Notification of Late Items Item Page Subject Item 1 5 PowerCo Presentation to the Taranaki Regional Council - PowerCo's 2018-2023 Investment Proposal Item 2 19 Confirmation of Minutes Item 3 26 Consents and Regulatory Committee Minutes Item 4 32 Policy and Planning Committee Minutes Item 5 38 Executive, Audit and Risk Committee Minutes Item 6 44 Draft 2017/2018 Annual Plan - Statement of Proposal

Biennial report 2012-2014

NPDC NP wastewater treatment plant consent monitoring report - Taranaki Regional Council.

Westown Haulage monitoring 2020-2021

2020 The fill area was coming to the end of fill capacity. No inappropriate material was observed. It was noted that the first of the three silt fences needed to be repaired. Although it was fine during the inspection, it had rained heavily prior to arrival, no issues were noted with regards to stormwater or visually in the receiving water. No dust or odours were noted. 20 May 2021 No activity was occurring on the site during the inspection. There were some piles of soil at the top

Civil Quarries Everett Rd quarry consent monitoring 2017-2018

regional plan, or it falls within some particular categories set out in Section 14. The Company holds water permit 10247-1 to cover the abstraction of groundwater incidental to quarry operations and for aggregate washing purposes. This permit was issued by the Council to the previous site operators (Inglewood Metal Ltd) on 1 December 2016 under Section 87(d) of the RMA. The permit was then transferred to The Company on 6 April 2017. page 5 Figure 1 Quarry operations,

McKechnie Aluminium Annual Report 2021-2022

be worse than it was due to rain earlier. The site manager advised this would be cleaned up. 4 May 2022 The site was busy with normal operations. Traffic was particularly busy within the scrap area and some swarf was observed tracking to the drains. All drain screens were in place and appear to be regularly maintained to prevent blocking. All hazardous chemicals were appropriately contained. Rainwater within bunding was at a low level. Spill kits were in place throughout the site and

New Plymouth Christmas Parade bus timetable

Depart Ariki St The Warehouse BBK Parklands Ave BBK Richmond St Queen St 3.00 pm 3.15 pm 3.18 pm 3.51 pm 3:56 pm P A R A D E 1 -2 P M *Route 20 – Waitara/Bell Block/NP (does not go to the Valley) FREEBUS Christmas Parade Rain date Sunday 1st December to the NOVEMBER 30 SATURDAY *routes run as per normal and stop at all stops*routes run as per normal and stop at all stops << /ASCII85EncodePages false /AllowTransparency false