applied (mm) m3 of effluent
Total 105.1 - 24,083
2.3.2.3 Method of irrigation
The effluent from the piggery is pumped to storage pond prior to land application. The Company
communicated that three different delivery systems were used during the 2021-2022 monitoring year:
1. Dribble bar – main method of effluent application, depths applied (~3 mm)
2. ‘Weta’ travelling rain gun – used to apply effluent to the Sand Dune block at 8mm depths during 8
months of the year.
3. Slurry tank
by NPDC that relate to the Colson Road landfill 14
Table 2 Monitoring programme objectives and programme development methodology 15
Table 3 Summary of monitoring activity for 2022-2023 16
page
iii
Table 4 Chemical analysis of Colson Road landfill combined site leachate discharge 33
Table 5 Results of analysis of under liner drainage for the year under review. 35
Table 6 Results of rain event monitoring – discharge and Puremu Stream samples, 1 June 2023 40
McIntyre
B K Raine
N W Walker
C S Williamson
Apologies
Notification of Late Items
Item Page Subject
Item 1 5 PowerCo Presentation to the Taranaki Regional Council -
PowerCo's 2018-2023 Investment Proposal
Item 2 19 Confirmation of Minutes
Item 3 26 Consents and Regulatory Committee Minutes
Item 4 32 Policy and Planning Committee Minutes
Item 5 38 Executive, Audit and Risk Committee Minutes
Item 6 44 Draft 2017/2018 Annual Plan - Statement of Proposal
NPDC NP wastewater treatment plant consent monitoring report - Taranaki Regional Council.
2020
The fill area was coming to the end of fill capacity. No inappropriate material was observed. It was noted
that the first of the three silt fences needed to be repaired. Although it was fine during the inspection, it had
rained heavily prior to arrival, no issues were noted with regards to stormwater or visually in the receiving
water. No dust or odours were noted.
20 May 2021
No activity was occurring on the site during the inspection. There were some piles of soil at the top
regional plan, or it falls within some particular
categories set out in Section 14.
The Company holds water permit 10247-1 to cover the abstraction of groundwater incidental to quarry
operations and for aggregate washing purposes. This permit was issued by the Council to the previous site
operators (Inglewood Metal Ltd) on 1 December 2016 under Section 87(d) of the RMA. The permit was then
transferred to The Company on 6 April 2017.
page
5
Figure 1 Quarry operations,
be worse than it was due to rain earlier. The site manager advised this
would be cleaned up.
4 May 2022
The site was busy with normal operations. Traffic was particularly busy within the scrap area and some swarf
was observed tracking to the drains. All drain screens were in place and appear to be regularly maintained
to prevent blocking. All hazardous chemicals were appropriately contained. Rainwater within bunding was at
a low level. Spill kits were in place throughout the site and
Depart Ariki St
The Warehouse BBK
Parklands Ave BBK
Richmond St
Queen St
3.00 pm
3.15 pm
3.18 pm
3.51 pm
3:56 pm
P
A
R
A
D
E
1
-2
P
M
*Route 20 – Waitara/Bell Block/NP
(does not go to the Valley)
FREEBUS
Christmas Parade
Rain date
Sunday 1st
December
to the
NOVEMBER
30
SATURDAY
*routes run as per normal and stop at all stops*routes run as per normal and stop at all stops
<<
/ASCII85EncodePages false
/AllowTransparency false