Your search for 'rain fall' returned 1989 results.

TRC Public Transport Advertising Policy

standards All advertisements, either procured by the Council or which appears on Council-controlled infrastructure, facilities or services must be consistent with the New Zealand Advertising Standards Code: https://www.asa.co.nz/codes/codes/advertising-standards-code/. Advertising content requirements Advertisements will not be permitted on Council infrastructure, facilities or services if the advertisement falls within any of the below categories: • relates to the sex

Advertising Policy Final 2024 01

standards All advertisements, either procured by the Council or which appears on Council-controlled infrastructure, facilities or services must be consistent with the New Zealand Advertising Standards Code: https://www.asa.co.nz/codes/codes/advertising-standards-code/. Advertising content requirements Advertisements will not be permitted on Council infrastructure, facilities or services if the advertisement falls within any of the below categories: • relates to the sex

Appendix 7: Good management practices for discharge of agricultural effluent

the tractor up to the pond. If the tractor slopes back too far, lubricating oil in the tractor engine will fall away from the front crank bearing, damaging the engine. When using contractors or hiring equipment, make sure that the equipment used has been cleaned before use on your farm. This is so diseases are not transferred within the effluent from one property to another. There are two types of contracting operations - pump spreaders and vehicle spreaders (honey wagons). It is the

JD Hickman consent monitoring 2020-2021

and suspended solids. page 6 2 Results 2.1 Water 2.1.1 Inspections 07 December 2020 An inspection was undertaken to assess compliance with resource consent conditions. It was raining at the time of the inspection. Four samples were obtained; one downstream (clear), one upstream (clear), one from the storm water discharge pipe (turbid) and one form the head waters adjacent to the storm water discharge pipe, at this location there was a visible sheen. The

NPDC Colson Road Landfill Annual Report 2023-2024

Table 3 Summary of monitoring activity for 2023/24 13 Table 4 Chemical analysis of Colson Road landfill combined site leachate discharge 27 Table 5 Sample results for characterisation of Stage 1 and 2 and Stage 3 leachate 28 Table 6 Results of analysis of under liner drainage for the year under review. 31 Table 7 Sample results for the characterisation of the under liner groundwater drainage 35 Table 8 Results of rain event monitoring–discharge and Puremu Stream, 26 September

Lepper Piggery consent monitoring 2018-2019

rain throughout the catchment. At the time of sampling the stream was in fresh (recession) and running at a moderately high flow rate at 7.3 m3/s. The page 13 stream was turbid and brown in colour. The piggery wastewater flow rate from the final pond was estimated to be at 14 L/s. The wastewater discharge from the final pond had no visual downstream environmental impact on the Waiongana Stream at the time of the survey. The consent holder continued to discharge for a

1857 Pukeiti Rhododendron Trust Newsletter SPRING 2023

propagation and consequent dissemination of the endangered rhododendrons whose future the Pukeiti Rhododendron Trust is trying to secure. Members got an opportunity to see the Rouse House propagator and improvements to the shade house which have been paid for by The Trust. These improvements are designed to increase the success rate of the propagation efforts. The Soup and Large Leaf Rhododendron Day was once again threatened by rain but it was decided to go ahead with it anyway. As it

Kowhai-D wellsite monitoring report 2016-2018

abstraction permit (groundwater) Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Petrochem Limited holds water permit 10295-1 to cover the taking of groundwater, as ‘produced water’, during hydrocarbon exploration and production activities at the Kowhai-D wellsite. This permit was issued by the

Application attachment appendix K Hydraulic and Geotecnical Assessment Manawa Energy 14 Feb 2023

the later (eastern) portions. The most significant structures/components within the Race and lake are summarised within Table 2 and are discussed further as follows. Table 2: Race and Lake Structures/Components Component Race Chainage (m) Comment Manganui River 0 Upstream end of race. Intake Structure 90 Controls abstraction from the Manganui River into race. Tariki Weir 720 Weir assists race flow measurements. Drop Structure 1270 Race invert level falls by