Your search for 'rain fall' returned 1983 results.

Annual reort 2012-2013

transfer the sales gas from the production station to the Kapuni Gas Treatment Plant. 1.3 Resource consents 1.3.1 Water abstraction permit Section 14 of the Resource Management Act stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits 6540 and 6541 to take and use groundwater from a bore/s lapsed in

Report 2012-2014

expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 12. Table 1 provides a summary of coastal permits held by STDC relating to coastal structures in the South Taranaki District. Table 1 Summary of coastal structure permits held by STDC Consent number Sub-type Location Purpose Expiry Date 5512-1 Protection Bayly Road Boulder rip rap seawall 1/06/2013* 5504-1 Protection Middleton Bay Boulder rip

Regional Soil Plan PDF 2021

legislative or administrative actions are consistent with promoting sustainable management of natural and physical resources. Issue** means a matter of concern to the region's community regarding activities affecting some aspect of natural and physical resources and the environment of the region. Iwi** means tribe or grouping of Māori people descended from a common ancestor(s). Iwi o Taranaki or iwi of Taranaki** refers to iwi whose rohe (territory or boundary) fall either wholly or

Annual report 2013-2014

or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Fonterra holds water permit 0047 to cover the abstraction of water from the Tawhiti Stream (Photograph 2), a tributary of the Tangahoe River, for the processing and manufacture of dairy products, cleaning of plant, and cooling purposes. This permit was re-issued by the Council on May 1996 under Section

Section 42a Report Future Urban Zone 04 March 2022

Operative and Draft District Plans will provide a maximum capacity for between 12,400 and 21,000 new dwellings. Slightly more than half of these dwellings are feasible to build in the current market conditions. When the 15-20 per cent margin required by the NPS-UDC is included, the residential capacity provided in the Operative District Plan falls short by 3,900 dwellings. However, the urban growth areas indicated in the Draft District Plan provides sufficient long term capacity, with an excess