Whakahono a Rohe decisions – These decisions are not in
the scope of this committee and fall under the full Council.
Review of Delegated Authority Manual – This will be discussed
at the Māori relationships going forward workshop as there was
confusion as to whether the request referred to the Delegations
Manual or the Committee Terms of Reference. It was noted that a
Governance Handbook is being arranged for representative
members.
Iwi Consent Processing Capacity – concerns raised …
See tables 1-3 for a summary of the resource consents issued in relation to quarry operations in Taranaki.
2.1.2 Water abstraction permits
Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is
expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular
categories set out in Section 14.
There are eight monitored quarries in Taranaki that hold a water abstraction consent. Four of
Waiwhakaiho River and
Te Henui Stream increases sharply as these waterways flow through urban areas from
upstream agricultural areas, because of water fowl in the lower reaches.
In terms of E. coli, bacteriological water quality showed some improvements in the latest
survey period in comparison with historical surveys. The total number of samples falling
within the “Alert” or “Action” categories (28% of samples) was equal with the average of all
the previous seasons but this was heavily influenced
(Eltham Road) 2026
5739-1 Structure for pipeline crossing of Waingongoro River - 2017
6455-1 Structure for piping of unnamed tributary 2017 2023
7487-1 Discharge solids to land and emissions to air 2017 2029
1.3.1 Water abstraction permit
Section 14 of the RMA stipulates that no person may take, use, dam or divert any
water, unless the activity is expressly allowed for by a resource consent or a rule in a
regional plan, or it falls within some particular categories set
Hongihongi-Herekawe catchment consent monitoring report - Taranaki Regional Council.
NPDC coastal structures consent monitoring report - Taranaki Regional Council
Cold Creek Community Water Supply Ltd resource consent monitoring report 2019-2020
STDC Eltham wastewater treatment plan consent monitoring report 2018-2019
Cold Creek Community Water Supply consent monitoring report 2018-2019
installation of a pond. TRC estimated that 261
consents fall into this category, and these were pro-rated across the soil and rainfall
bands in proportion to area in each band.
A proportion of existing soil ponds (10%) are assumed to require liners to prevent
leakage of effluent into the soil and groundwater. This is based on feedback from
TRC regarding their expectation regarding the likely impact of the measure.
However a sensitivity test is undertaken in which 70% of the soil ponds require