G J Elliott submission attachment

effective under the new operation. In terms of equipment that AFT have to mitigate effects of odour and dust, these are all based on having birds contained within a negative pressure maintained enclosed space. 22. Likewise the TRC in its assessment of the Application appears to make a similar error of omission to conclude that the consent application falls under Rule 52 of the RAQP. Rule 52 covers “Existing poultry farming processes” whereas AFT (and Tonkin and Taylor) clearly

McKee Mangahewa PS consent monitoring 2018-2019

discharge points to the stream were observed, with no effects evident in the stream as a result of stormwater discharging offsite. A new flare stack had been installed to flare natural gas venting from the hydrocarbon storage tanks. The separation equipment was all functional and operating as required. The pilot flares were clean burning with no sign of smoke. 22 November 2018 Heavy rain had fallen the day prior to the inspection. No hydrocarbon sheens were noted in puddles or within

Greymouth Petroleum Ltd Ngatoro E Hydraulic Fracturing Monitoring Programme Report 2022 2023

signed resource consent please contact the TRC Consents department) page Water abstraction permits Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits authorising the abstraction of water are issued by the Council under Section 87(d) of the RMA. Water discharge

Taranaki Thoroughbred Racing consent monitoring 2018-2019

groundwater levels as a result of the authorised abstraction. During the period under review, groundwater levels measured within monitoring bore GND2103 varied in response to abstraction from GND2010. When abstraction volumes increase over the summer months the groundwater levels fall in response and during the winter months, when abstraction decreases, the groundwater levels recover. In summary, groundwater level monitoring data gathered by the Council does not indicate any long-term

Long-Term Plan 2018/2028 Consultation Document

revenue streams. Port Taranaki Ltd operates in a highly- competitive trading environment and there are no guarantees that it will be able to continue to deliver forecast dividend levels. Accordingly there is a risk that profits and dividends may fall at some future point. This is the biggest risk to the delivery of the Council’s proposed programmes. Over the ten years, there are fluctuations in the level of changes in general rates. Unchanged, these fluctuations would result in