Todd Petroleum Mining Company Kapuni Production Station Annual Report 2023-2024
Todd Petroleum Mining Company Kapuni Production Station Annual Report 2023-2024
Todd Petroleum Mining Company Kapuni Production Station Annual Report 2023-2024
OU is the appropriate guideline for a ‘moderately’ sensitive receiving environment. I consider that the Mr McDonald’s workshop/business would fall within this moderate sensitivity category. As such the 5 OU criteria within the MfE GPG Odour would be applicable to this receptor location. 1.15 I also wish to point out that the 2 OU contour in Figure 3 (proposed farm) extends well into the Area Q land on the other side of Airport Drive. It is my understanding
roles in stream ecosystems on top of their intrinsic biodiversity value. They convert primary energy inputs to streams, from leaves that fall in and algae and bacteria growing on the streambed in response to light and ‘catchment tea’ (dissolved carbon from soils), into food for fish such as whitebait, eels and trout, and birds. In the process they keep the streambed clean and recycle nutrients, keeping the stream healthy and productive. Q&A page www.niwa.co.nz Water & Atmosphere
Manawa Energy Mangorei HEP Annual Report 2023-2024
Waitaha Industrial Catchment Annual Report 2023-2024
Regional Transport Committee Agenda 2 March 2022
well-maintained with approximately ten small stockpiles of sawdust waiting to be spread. The area was intact, with no cracking or slumping evident on either the fill area or the tip face. No unauthorised material was noted. There was no ponding observed, despite heavy rain the previous day, and the material was damp underfoot. The pre-fill gully was well grassed with no sign of exposed soil or sediment runoff. The stage 1 fill area was damp underfoot and had been recently grazed, and showed no sign of
minor amount of erosion at one point that was likely to have been caused by the heavy rain in the previous week. The stormwater ponds were all nearly full, with approximately 0.3-0.5 m of freeboard. The contents were a relatively clear brown colour, and the lowest pond had an iron oxide sheen present on the surface. The downstream stormwater drain had recently been cleared of vegetation and there were no obstructions to flow. Silt controls were in place, and appeared to be effective as the
the time of the inspection with 5 mm of rain over the past three days. Significant earthworks were being undertaken at the site. The contractor on-site outlined that the whole area was being prepared for eventual filling. Pipe had been laid down the length of both channels to pipe the spring water. Stormwater pipes and risers had also been installed to intercept stormwater from the surrounding pasture. At the time of the inspection, the contractor was digging a retention/silt pond for