13 Summary of performance for dam and diversion consent 5350-1 60
Table 14 Summary of performance for structures consent 5351-1 61
List of figures
Figure 1 Regional map of Taranaki showing the location of the Eltham Central landfill site 4
Figure 2 Aerial view of the Eltham Central landfill site and sampling points, up to June 2017 16
Figure 3 Increased Eltham Central landfill monitoring network, July 2017 onward 17
Figure 4 Piper diagram for the surface water monitoring
TAG Oil Cheal-C consent monitoring report - Taranaki Regional Council.
Greymouth Petroleum Turangi B consent monitoring report - Taranaki Regional Council.
Methanex Motonui and Waitara Valley consent monitoring report 2018-2019
Taranaki Regional Council website (www.trc.govt.nz) for
public and local health authority notification in particular, as soon as checking had
been completed. Mapping of the results was also included on the newly established
Taranaki District Health Board website (www.tdhb.org.nz) in the 2009-2010 season
(see Appendix VI). Where results fell in the ‘Action’ mode, further investigations (eg
sampling and inspections) were performed when considered necessary ie: where
historical databases and staff
STOS Maui & Kapuni production stations consent monitoring report - Taranaki Regional Council.
photograph or map showing the location of the former
landfill, and an outline of the matters covered by NPDC’s permit(s) for the site.
page
2
Subsection 2 presents the results of monitoring of the NPDC’s activities at each of the
sites during the period under review, including scientific and technical data.
Subsection 3 discusses the results, their interpretation, and their significance for the
environment in the immediate vicinity of the site under discussion.
Subsection 4
Greymouth Petroleum Kowhai-C consent monitoring report - Taranaki Regional Council.
Lower Waiwhakaiho Annual Report 2020-2021
nature of the monitoring programme in place for the period under review; and
• a description of the activities and operations conducted in the catchment.
Sections 2-15 separately detail each company’s onsite activities and performance.
page
4
In each subsection 1 (e.g. section 2.1) there is a general description of the industrial activity and associated
discharges, a photograph or map showing the location of the activity, and an outline of the matters covered
by the