2013 to 30 June 2014 20
Figure 6 Examples of river flows at Rimu Street during periods of 400 l/s (a), 600
l/s (b) , and 700 l/s (c) residual flow releases and daylight (950 l/s)
generation flow compliance during the 2013-2014 period 21
Figure 7 Water temperature monitoring sites (W1, W5, W7) in the lower
Waiwhakaiho River catchment 24
Figure 8 Aerial location map of monitoring sites 25
Figure 9 Water temperature ( C) in the Waiwhakaiho River (Egmont Village – SH3
(upper), Hydro
2014-2015 period 21
Figure 7 Water temperature monitoring sites (W1, W5, W7) in the lower
Waiwhakaiho River catchment 24
Figure 8 Aerial location map of monitoring sites 25
Figure 9 Water temperature (˚C) in the Waiwhakaiho River (Egmont Village – SH3
(upper), Hydro Road (centre), and Rimu Street (lower)), for the period 1
July 1992 to 30 June 2015 27
Figure 10 Instantaneous water temperature differences (˚C) between Waiwhakaiho
River sites during the monitoring period – SH3 and
Trustpower Pātea hydro power scheme resource consent monitoring report 2019-2020
use.
2.4 Contingency plan
Taranaki Ventures Limited has provided a general contingency plan, as required by
Condition 4 of resourse consent 9423-1 with site specific maps which cover all
onshore sites that they operate. The contingency plan has been reviewed and
approved by officers of the Council.
2.5 Investigations, interventions and incidents
The Council operates and maintains a register of all complaints or reported and
discovered excursions from acceptable limits and
Greymouth Petroleum Ngatoro G consent monitoring programme - Taranaki Regional Council.
List of figures
Figure 1 Regional map showing locations of Remediation NZ’s Taranaki sites 5
Figure 2 RNZ site, Mokau Road, Uruti 6
Figure 3 Freshwater sampling sites at RNZ Uruti sites 14
Figure 4 Irrigation and groundwater bores at RNZ Uruti sites 15
Figure 5 Total dissolved solids in groundwater 27
Figure 6 Graph showing sodium absorption ratio in soil of both irrigation areas 29
Figure 7 Aerial view of Remediation NZ’s Waitara and Pennington Rd sites 36
page
Todd Petroluem Mining Co Kapuni produciton station consent monitoring report 2017-2018
Shell Kapuni annual consent monitoring report 2016-2017
STOS KA-19/20 wellsite consent monitoring report - Taranaki Regional Council.
monitoring programme 7
Table 3 Surface water monitoring site details 8
Table 4 Results of groundwater sampling carried out in relation to the Kowhai-4 fracturing event 11
Table 5 Results of hydraulic fracturing fluid sampling 13
Table 6 Results of hydraulic fracturing return fluid sampling 14
Table 7 Summary of performance for consent 10297-1 17
List of figures
Figure 1 Location map 5
page
1
1 Introduction
1.1 Compliance monitoring programme