Cemetery location map 4
Figure 2 Burial Plan for first five years of operation 9
Figure 3 Groundwater elevations 2020-2021 in comparison to rainfall 24
Figure 4 Groundwater levels GND2623, GND2625 and GND2624 compared to minimum required water
table depths by burial type 25
Figure 5 Groundwater levels GND2484 and GND3032 compared to minimum required water table
depths by burial type 26
Figure 6 Type of internment planned for Area-A and Area-B 28
page
1
consents held by STDC Patea Beach green waste discharge
List of tables
Table 1 Please see the notes regarding this table below 5
Table 4 Example Summary of performance for consent 6088-3 9
Table 5 Evaluation of environmental performance over time 11
page
ii
List of figures
Figure 1 Regional map showing the location of the Patea green waste site 4
Figure 2 Aerial view of the Patea Beach green waste disposal area 4
List of photos
Photo 1 Patea
page
A
P
P
E
N
D
IC
E
S
A
P
P
E
N
D
IX
I
X
Appendix IX
Maps of defined urban catchments
page
A
P
P
E
N
D
IC
E
S
A
P
P
E
N
D
IX
I
X
page
2
8
5
APPENDICES
APPENDIX IX
Figure 1: Eltham Defined urban catchment.
page
Map - Key Native Ecosystems – private and publicly managed.
WHAT MAKES KEY NATIVE
ECOSYSTEMS REGIONALLY
SIGNIFICANT?
Key Native Ecosystems are regionally significant
because they are:
home to threatened or regionally distinctive
indigenous plant and animal species, or
representative of originally rare ecosystems
and indigenous vegetation now much
reduced from its original extent (<10 or
20%), and/or
connect or buffer other sites of value,
or provide seasonal or
tributary. The
underlying landform is of LUC class 4s1, with Uia sandy loam soils. The site is located in the Egmont
Ecological district, and the ecosystem type for this area has been mapped as MF8-2, Rimu, rata, kāmahi
forest (Singers 2016), less reduced or intact, with 68% remaining (Leathwick, 2017). The structure of the
vegetation at the site, as surveyed in the field, is dominated by a canopy of established regenerating
kamahi, with tawa, rimu, miro and kahikatea becoming apparent in the
page
ii
List of tables
Table 1 Summary of performance for Consent 6088-3 to discharge green waste
onto land for stabilisation purposes 11
List of figures
Figure 1 Regional map showing location of the Patea green waste site 4
Figure 2 Aerial view of the Patea Beach green waste disposal area 5
page
1
1. Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1
Key Native Ecosystem. In relation
to each site, a sheet has been compiled summarising information on its
location, land tenure, and physical and ecological features. For each site, the
ecological values of regional significance, threats to those values, formal
protection status and other protection (if any) are also identified. A map for
each site is also provided.
Status and availability
The Inventory represents the data and information available at this time
from published and
Bibliography and references 14
Appendix I Resource consent held by Cudby Contracting Limited Quarry 1
page
ii
List of tables
Table 1 Summary of performance for Consent 7845-1 for discharge of
stormwater into land from quarry activities 9
List of figures
Figure 1 Aerial map showing Cudby Contracting Limited’s quarry site 4
page
1
1. Introduction
1.1 Compliance monitoring programme reports and
RTP001013 (lake adjacent cleanfill) 6
November 2012 (and summary of previous analyses) 8
Table 2 Summary of performance for consent 5606-1 to discharge cleanfill
material onto and into land for quarry reinstatement purposes 10
List of figures
Figure 1 Regional map showing the location of cleanfill/composting site 3
Figure 2 Aerial view of the Manutahi Rd compost and cleanfill site 4
List of photos
Photo 1 Reinstated compost stormwater pond 7
Photo 2
land 9
List of figures
Figure 1 Regional map showing the location of the site 4
Figure 2 Aerial image of the property 5
page
1
1. Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 Introduction
This report is the Annual Report for the period July 2013-June 2014 by the Taranaki
Regional Council (the Council) on the monitoring programme associated with the
resource consent held by