Your search for 'iwi map' returned 2244 results.

Edward John Whiting's evidence

minimum (if at all) and we are trialling at our other Midhirst Free Range farm no spraying and only mowing. 24 In my view the conversion to free range farming, reduction in the number and mass of birds, improvements undertaken and proposed, and odour management will substantially reduce the potential for adverse odour and dust effects. 25 A map of Airport Farm free range poultry farm with Shed's labelled and range areas is included as Attachment D. Additional benefits of

Waikaikai Landfarm consent monitoring 2018-2019

10 Company provided landfarming location map WRS Waikaikai Landfarm 18 Table 11 Summary of performance for consent 5956-2.0 2018-2019 monitoring period 20 Table 12 Evaluation of environmental performance over time 23 List of figures Figure 1 WRS Waikaikai Landfarm and regional insert 5 Figure 2 WRS Waikaikai Landfarm groundwater monitoring well locations 11 Figure 3 Soil sample transects 2018-2019 monitoring period 14 List of photos Photo 1 An example of an

Remediation Hearing Applicant Legal Submission

the Applicant under the standard timetable for evidence exchange under RMA, s103B. [4] Included in the pre-circulated material is a Graphics and Data Bundle comprising the following: (a) Item 1- an aerial plan at 1:15,OOO@A3 showing the site, surrounding dwellings and water sampling locations. Superimposed onto the map are isochrones at 1.0 and 2.0 km showing the distance from the sampling location HHG0000115, which was chosen as the notional centre of the site's

Annual report 2013-2014

Investigations, interventions, and incidents 35 5.2 Discussion of site performances 37 5.3 Environmental effects of exercise of consents 38 5.4 Evaluation of performance 38 5.5 Recommendations from the 2011-2013 Biennial Report 38 5.6 Alterations to monitoring programmes for 2014-2015 38 6. Recommendations 40 Glossary of common terms and abbreviations 41 Bibliography and references 44 Appendix I Resource consents held by Origin Energy Resources NZ Ltd & AR Geary 47 Appendix II Maps

OMV NZ Pohokura Production Station Annual Report 2022-2023

either side of the associated pipelines connecting the three offshore wellhead platforms to the foreshore at mean high water spring Condition requirement Means of monitoring during period under review Compliance achieved? 1. Survey and map position of completed platforms and pipeline within 90 days of completion of construction Information supplied Yes 2. Exercise of consent shall not limit public access to the CMA Inspections and liaison with consent holder Yes 3.

Civil Quarries Ltd Everett Road Quarry Monitoring Programme Annual Report 2020 2021 2975459

11 3 Discussion 13 3.1 Discussion of site performance 13 3.2 Environmental effects of exercise of consents 13 3.3 Evaluation of performance 14 3.4 Recommendations from the 2019-2020 Annual Report 16 3.5 Alterations to monitoring programmes for 2021-2022 16 3.6 Exercise of optional review of consent 17 4 Recommendations 18 Glossary of common terms and abbreviations 19 Bibliography and references 21 Appendix I Map of stormwater and washwater treatment system December 2020 …

Civil Quarries Ltd Everett Road Quarry Monitoring Programme Annual Report 2020 2021 v2

11 3 Discussion 13 3.1 Discussion of site performance 13 3.2 Environmental effects of exercise of consents 13 3.3 Evaluation of performance 14 3.4 Recommendations from the 2019-2020 Annual Report 16 3.5 Alterations to monitoring programmes for 2021-2022 16 3.6 Exercise of optional review of consent 17 4 Recommendations 18 Glossary of common terms and abbreviations 19 Bibliography and references 21 Appendix I Map of stormwater and washwater treatment system December 2020 …

Civil Quarries Ltd Everett Road Quarry Monitoring Programme Annual Report 2020 2021

11 3 Discussion 13 3.1 Discussion of site performance 13 3.2 Environmental effects of exercise of consents 13 3.3 Evaluation of performance 14 3.4 Recommendations from the 2019-2020 Annual Report 16 3.5 Alterations to monitoring programmes for 2021-2022 16 3.6 Exercise of optional review of consent 17 4 Recommendations 18 Glossary of common terms and abbreviations 19 Bibliography and references 21 Appendix I Map of stormwater and washwater treatment system December 2020 …

Civil Quarries Ltd Everett Road Quarry Monitoring Programme Annual Report 2020 2021

11 3 Discussion 13 3.1 Discussion of site performance 13 3.2 Environmental effects of exercise of consents 13 3.3 Evaluation of performance 14 3.4 Recommendations from the 2019-2020 Annual Report 16 3.5 Alterations to monitoring programmes for 2021-2022 16 3.6 Exercise of optional review of consent 17 4 Recommendations 18 Glossary of common terms and abbreviations 19 Bibliography and references 21 Appendix I Map of stormwater and washwater treatment system December 2020 …