Your search for 'iwi map' returned 2244 results.

STDC Eltham WWTP Annual Report 2022-2023

Table 4 Water quality results downstream of the Eltham WWTP 2022-2023 (SEM samples) 11 Table 7 Summary of performance for consent 7521-1 14 Table 8 Evaluation of environmental performance over time 15 List of figures Figure 1 Schematic layout of Eltham WWTP prior to the diversion of wastewater to the Hawera WWTP 3 Figure 2 Aerial view of the Eltham WWTP 4 Figure 3 Aerial map showing location of sampling sites 10 List of photos Photo 1 Overflow detention pond

Annual reort 2012-2013

Condition 6 states that the consent holder shall adopt the best practicable option to minimise adverse environmental effects. Condition 7 requires that work associated with the structure shall comply with noise standards. Condition 8 requires the consent holder to survey and map the position of the structures. Condition 9 requires the consent holder undertake pre and post-lay surveys of the pipeline corridor. Condition 10 states that the structure shall be removed and the area

Stepping into the River (from NIWA magazine)

to filling the spatial gaps in coverage of freshwater information between monitoring points, says NIWA environmental modeller Dr Doug Booker. NIWA has recently released a free app – NZ River Maps (https://shiny.niwa.co.nz/nzrivermaps/) – that uses these model predictions to show patterns across New Zealand’s rivers in about 100 attributes covering hydrology, water quality, fish distributions, invertebrate metrics, suspended and deposited sediment and fish and bird habitat. No more

Site 87

Predator-Free Taranaki It’s important to determine what predators are where before placing traps. A number of schools have been tracking and mapping predators around their school grounds and local bush using tracking tunnels, chew cards and wax tags. Some students have even made their own monitoring gear. No shortage of rats, mice and hedgehogs have been detected. Manaaki Whenua Landcare Research have produced some fantastic guides, available online, that we’ve

Urenui & Onaero monitoring report 2018-2019

Table 11 Summary of performance for consent 1389-3 14 Table 12 Evaluation of environmental performance over time 14 List of figures Figure 1 Map of sampling sites, sewage disposal system and other features of interest at Urenui Beach Camp 6 Figure 2 Map of sampling sites, sewage disposal system and other features of interest at Onaero Bay Holiday Park 7 List of photos Photo 1 Urenui estuary and beach camp 4 Photo 2 Urenui Beach, December 2017 6 Photo 3 Onaero

Urenui & Onaero monitoring report 2017-2018

Summary of performance for consent 1389-3 14 List of figures Figure 1 Map of sampling sites, sewage disposal system and other features of interest at Urenui Beach Camp 9 Figure 2 Map of sampling sites, sewage disposal system and other features of interest at Onaero Bay Holiday Park, including the two additional sampling sites monitored in 2017-2018 (*) 11 List of photos Photo 1 Urenui estuary and beach camp 4 Photo 2 Urenui Beach, May 2017 7 Photo 3 Onaero Beach, May

Annual report 2016-2017

Consent 1389-3 14 List of figures Figure 1 Map of sampling sites, sewage disposal system and other features of interest at Urenui Beach Camp 9 Figure 2 Map of sampling sites, sewage disposal system and other features of interest at Onaero Bay Holiday Park, including the two additional sampling sites monitored in 2016-2017 (*) 11 List of photos Photo 1 Urenui Estuary and Beach Camp 4 Photo 2 Urenui Beach, May 2017 7 Photo 3 Onaero Beach, May 2015 7 page

Annual report 2015-2016

19 Figure 4 Long-term TDS concentration GND2286 - 2287 Sep 2012-Nov 2016 20 List of photos Photo 1 An example of an extracted soil core 10 Photo 2 Company supplied spreading map of the Oeo landfarm 13 page 1 1. Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is for the period July 2015-June 2016 by the Taranaki Regional Council (the Council) on the monitoring

Annual report 2014-2015

location and approximate extent of the Symes Manawapou Landfarm and approximate regional location (inset) 7 Figure 2 The Company supplied map detailing previously spread areas RNZ1, 2 & 3 and 15 Figure 3 Location of composite soil samples at the Symes Manawapou Landfarm 16 Figure 4 Groundwater monitoring well locations 17 Figure 5 Historic Total Dissolved Salt Concentration by monitoring well location 20 List of photos Photo 1 Landfarm post application and reinstatement

Taranaki By Products consent monitoring 2018-2019

returned to the Council in September 2013, at the request of the Company. page 9 Table 2 Taranaki By-Products point source monitoring location key Site Description Map reference, NZTM Site code Easting Northing A Aerobic pond effluent 1703086 5623907 IND004004 B Cooling water discharge 1702015 5623991 IND002004 C Stormwater, firewater, coolant and groundwater seepage from reservoir 1701968 5624052 IND001014 D Stormwater, firewater, coolant and