Your search for 'iwi map' returned 2217 results.

Resource consents 6 November 2020 - 21 January 2021

Te Atiawa (Statutory Acknowledgement) Engagement or consultation: Te Kotahitanga o Te Atiawa Trust Comment on application received  Application lacks sufficient detail  Generally consistent with Iwi Environmental Management Plan R2/1899-3.0 Commencement Date: 27 Nov 2020 Araheke Farm Limited Expiry Date: 01 Dec 2044 648 Egmont Road, RD 2, New Plymouth 4372 Review Dates: Jun 2026, Jun 2032, Jun 2038 Activity Class: Controlled

Appendix C - Integrated Management System

• Opportunities for personal development Regulators • To meet the required laws and regulations • To maintain high standards of corporate governance IWI • Exercise of Kaitiakitanga (guardianship and protection) for the Mimitangiatua River and Haehanga Stream. • To be kept informed about environmental performance • To have confidence in site management and the ability of Remediation NZ to avoid adverse environmental effects • To have lines of communication in place so

NP Waste Water Treatment Plant consent monitoring 2017-2018

Council, iwi and interested parties regarding the operation and monitoring of the consent. Condition 24 is a review provision. NPDC holds discharge permit 2982-4 to cover the discharge of up to 60 m3/day of leachate from a sludge stabilisation lagoon to groundwater in the vicinity of the Waiwhakaiho River. This permit was issued by the Council on 17 October 2002 under Section 87(e) of the RMA. It is due to expire on 1 June 2020. There are five special conditions attached to the permit.

Resource consents 22 January to 2 March 2021

4388 Review Dates: June 2027, June 2033 Activity Class: Controlled Location: Durham Road Upper, Inglewood Application Purpose: Replace To discharge washdown water from the cleaning of broiler chickensheds onto and into land Rohe: Te Atiawa (Statutory Acknowledgement) Engagement or consultation: Te Kotahitanga o Te Atiawa Trust Comment on application received  Generally consistent with Iwi Environmental Management Plan  Application lacks

24Furtherinformation AppendixT

friendly work environment . To feel valued and appreciated . Opportunities for personal development Regulators . To meet the required laws and regulations . To maintain hiqh standards of corporate qovernance IWI . Exercise of Kaitiakitanga (guardianship and protection) for the Mimitangiatua River and Haehanga Stream. . To be kept informed about environmental performance . To have confidence in site management and the ability of Remediation NZ to avoid adverse environmental effects . To

PTL dredging consent monitoring 2016-2018

the consent. The trailer suction dredge, the Pelican (Photo 1), is equipped with GPS navigation systems and lateral thrusters, which allow precise positioning of the vessel (Atkinson et al., 2001). This navigation system also allows the vessel’s location to be measured continuously, producing a map of its track at all times. An example of the continual monitoring of the Pelican’s tracks is shown in Figure 3. Tracks of the vessel show where each dredged load came from, and into what area

Report 2014-2016

producing a map of its track at all times. An example of the continual monitoring of the Pelican’s tracks is shown in Figure 3. Tracks of the vessel page 6 show where each dredged load came from, and into what area it was dispersed within the spoil site (Figure 2). The vessel is a split hopper dredge with a hopper capacity of 965 m3. Once the vessel is full and on site ready to dispose the spoil, the entire hull opens in half where it pivots about its longitudinal

Message to Wellington 2017

Maori and the region as a whole. The next Government must continue to make the completion of Treaty settlements in Taranaki a priority. Good progress has been made on Treaty settlements with all bar one (of eight) iwi having now settled their Treaty claims. The remaining iwi (Ngati Maru) are currently in negotiations with the Crown. Claims relating to the Mounga are under negotiation. A reconciliation between the Crown and Parihaka has recently been completed (9 June 2017) and a

Origin Energy NZ Ltd Rimu pipeline leak, October 2010: Cause, remediation & learning points

so there was no need for the Council to notify the Iwi as is the usual case for incidents with environmental effects. 2.8 The Vector flyover pipeline inspection on the 14th September 2010 did not observe anything of concern along the pipeline easement, so it can be assumed the leak started approximately between 14th September and 8th October. 2.9 Immediately after the leak was discovered, three pipelines located in an easement, close to the leak point, were depressurised and use

Natural Resources Plan Information sheet 1

statements prepared under the RMA and also take into account matters identified in iwi management plans as well as district plans. The figure below summarises this hierarchy of planning documents. How does the Natural Resources Plan relate to other policy documents and plans? Resource management reforms - the development of a Strategic Planning Act and the Natural and Built Environments Act. Development of various national policy statements and national environmental standards. Approach to