Your search for ''nvOpzp; AND 1=1 OR (<'">iKO)),' returned 5142 results.

Annual report 2013-2014

Section 4 presents recommendations to be implemented in the 2014-2015 monitoring year. A glossary of common abbreviations and scientific terms, and a bibliography, are presented at the end of the report. page 2 1.1.3 The Resource Management Act 1991 and monitoring The Resource Management Act 1991 (RMA)primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may

Taranaki tsunami inundation analysis

1 2 Sourced from the LINZ Data Service and licensed for re-use under the 0 1,000500 Meters ¯ LIMITATIONS AND COPYRIGHT This map may not be reproduced or transmitted to any other party, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the permission of the copyright holder. DISCLAIMER The Taranaki Regional Council cannot guarantee that the data shown on this map is 100% accurate. Tsunami Inundation Map The inundation zones were

Annual report 2015-2016

3769-3 11 List of figures Figure 1 Location of bacteriological sampling sites and treatment system 5 List of photos Photo 1 Wastewater ponding and weed growth on the surface of the eastern filter bed, 21 December 2015 8 Photo 2 Eastern filter bed with no wastewater ponding or weed growth, 16 February 2016 9 page page 1 1. Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991

Annual report 2014-2015

The Council did not receive any complaints or register any unauthorised incidents associated with any of the Company’s DWI activities during the 2014-2015 monitoring period. During the year under review Todd Energy Limited demonstrated a high level of environmental performance and a high level of administrative performance and compliance with the resource consents. For reference, in the 2014-2015 year, 75% of consent holders in Taranaki monitored through tailored compliance monitoring

Annual report 2015-2016

the Company never generated when the lake level was at or below the minimum authorised level during the reporting period, and that leakage was the principle cause when a low lake level occurred. There is still concern about the sand inundation of the head of Opunake Lake, and the reduced recreational value that has resulted from this. The Company is continuing to investigate an array of options, including reducing the potential for sand ingress, modifying the head of the lake to allow better

Appendix O - Environmental Management Plan

Revision No:1.5 Date:12-6-2020 Controller: C Kay 1.0 Purpose of the Plan The purpose of this document is to ensure the operation of the Uruti farm is managed appropriately using Good Management Practices and operates within regulatory rules and resource consent conditions. A major focus of this plan is to avoid, remedy or mitigate the loss of nitrogen to surface water and ground water from irrigated wastewater onto the effluent block. 2.0 General The Uruti farm was purchased in 2001

Wai-inu Beach monitoring report 2017-2018

recommendations to be implemented in the 2018-2019 monitoring year. A glossary of common abbreviations and scientific terms, and a bibliography, are presented at the end of the report. 1.1.3 The Resource Management Act 1991 and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the neighbourhood or the wider community around an activity, and

Report 2013-2014

hydraulic fracturing activities at the Kowhai-C wellsite. Greymouth Petroleum Limited notified the Council of its intention to test the well and combust gas intermittently at the Kowhai-C wellsite between 8 January 2014 and 9 February 2014. Although gas combustion was anticipated intermittently for approximately two weeks, gas combustion only occurred intermittently over the course of a few days in conjunction with well testing and pipeline installations. No offensive or objectionable odours,

Greymouth Petroleum DWI monitoring 2018-2019

any issues with any injection well currently in use, or the on-going ability of the receiving formation to accept injected fluids. The results of groundwater quality monitoring undertaken show no adverse effects of the activity at on local groundwater resources. Inspections undertaken during the monitoring year found sites being operated in a professional manner and there were no Unauthorised Incidents in relation to any of the Company’s DWI consents. During the year, the Company

Annual report 2016-2017

defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the neighbourhood or the wider community around an activity, and may include cultural and social- economic effects; b. physical effects on the locality, including landscape, amenity and visual effects; c. ecosystems, including effects on plants, animals, or habitats, whether aquatic or terrestrial; d. natural and physical resources having special