Your search for ''nvOpzp; AND 1=1 OR (<'">iKO)),' returned 5182 results.

Cold Creek consent monitoring 2020-2021

showed that CCCWSL complied with consent conditions in regards to discharge standards and abstraction rates. There were no unauthorised incidents recording non-compliance in respect of this consent holder during the period under review. The results of the biomonitoring surveys found no evidence of effects as a result of discharges, structures or water abstraction. During the year, CCCWSL demonstrated a high level of environmental and administrative performance with resource consents.

Stratford DC landfills monitoring 2020-2021

Pukengahu closed landfills included one site inspection each, along with two water samples collected from each site for physicochemical analysis. The monitoring showed that there were no significant adverse effects occurring as a result of the exercise of the Huiroa or Pukengahu landfill consents. There were no unauthorised incidents noted in respect to either landfill during the year under review. During the year, SDC demonstrated a high level of environmental and high level of

Interim Version of the Proposed Coastal Plan

1 Schedule 1 section 16 (of the RMA) directs a local authority to make an amendment to its proposed plan that is required by a direction of the Environment Court under section 293. 2 Section 86F (of the RMA) directs that rules in a proposed plan must be treated as operative if the time for making submissions and lodging appeals has expired and, in relation to the rule, no appeals have been lodged, all appeals have been determined or all appeals withdrawn or dismissed. page i i

Maui PS consent monitoring 2020-2021

environment resulting from the exercise of the air discharge consent. The ambient air quality monitoring at the Maui Production Station showed that levels of carbon monoxide, combustible gases, PM10 particulates, and nitrogen oxides were all below levels of concern at the time of sampling. No offensive or objectionable odours were detected beyond the boundaries during inspections. During the period under review, OMV demonstrated an overall high level of both environmental performance and

Stratford water supplies consent monitoring 2020-2021

The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the neighbourhood or the wider community around an activity, and may include cultural and social- economic effects; b. physical effects on the locality, including landscape, amenity and visual effects; c. ecosystems, including effects on plants, animals, or habitats, whether aquatic or

McKechnie Aluminium monitoring 2020-2021

ecosystems for zinc or copper, and all other parameters were below levels stipulated by consent conditions. Biomonitoring results indicated that treated stormwater discharged from the site was not having a detrimental effect on the macroinvertebrate communities of the unnamed tributary of the Mangaone Stream. The results from deposition gauging indicated that there was an environmentally acceptable level of particulate deposition in the vicinity of the foundry site. No visible emissions or

Ample Group monitoring report 2020-2021

catchment, a tributary of the Patea River. The Company currently processes only beef. Wastewater is treated in a two pond system, which is either irrigated to land when conditions allow, or to the Kahouri Stream, ideally during high flow conditions. This report for the period July 2020 to June 2021 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance performance during the period under review. The

Resource consents issued 1 October - 11 November 2021

onto land, and until 1 December 2022 after treatment in an oxidation pond system and constructed drain, into the Mangaone Stream Rohe: Ngati Maru Te Atiawa (Statutory Acknowledgement) Engagement or consultation: Te Kotahitanga o Te Atiawa Trust Comment on application received  Generally consistent with Iwi Environmental Management Plan  Application lacks sufficient detail Te Runanga o Ngati Maru (Taranaki) Trust Provided with application

Memo 04 March 2022

provisions for Area R and for Area Q 2.1. The area known as “Area R” is zoned in the PDP as a Special Purpose - Future Urban Zone. As noted in the overview to the zone chapter, this zone applies to land that has been identified as being suitable for urbanisation in the future. When the land is ready to be developed for urban purposes, it will be re-zoned to enable that to occur (e.g. to a residential or industrial zone) and an approved structure plan will be required before

Application Appendix A Land Ownership Maps 20 02053 4 0 + 5 other renewals Trustpower 25 Nov 2020

Type is listed as Iwi based on data from the Maori Land Online web application (https://www.maorilandonline.govt.nz/) or where the parcel intent is Maori. This may not be reflective of all Maori owned land or interests in the area. 1. The Owners column has been modified from the original data from LINZ. a. The Department of Conservation (DOC) has been listed as the owner in cases where 1) there was no owner information available in the LINZ data and 2) the majority of a parcel fell